Cargando…
RF System Availability and Performance during Run 2
The Run 2 operation and availability for the LHC RF system are presented, including year-to-year performance comparisons. In addition, the evolution of the present RF system is discussed, with improvements in diagnostics, operation, and software being highlighted. Lessons learned from the Run 2 RF p...
Autores principales: | Turaj, K, Arnaudon, L, Baudrenghien, P, Brunner, O, Butterworth, A, Gerigk, F, Montesinos, E, Shaposhnikova, E, Timko, H, Valuch, D |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750282 |
Ejemplares similares
-
LHC rf system performance in 2017
por: Timko, H, et al.
Publicado: (2019) -
Status and commissioning plans for LHC Run 2. The RF system.
por: Baudrenghien, P, et al.
Publicado: (2014) -
Operation Experience with the LHC ACS RF System
por: Turaj, Katarzyna, et al.
Publicado: (2019) -
Commissioning of the 400 MHz LHC RF System
por: Ciapala, Edmond, et al.
Publicado: (2008) -
Operational and beam dynamics aspects of the RF system in 2016
por: Timko, H, et al.
Publicado: (2017)