Cargando…

Run 2 Overview of the LHC Beam Instrumentation

This papers reviews the implemented improvements, operational experience, and performance reach of the major LHC Beam Instrumentation systems, excluding transverse beam profile diagnostics, throughout the LHC Run 2. The major hardware and software changes since the Long Shutdown 1 (LS1) are highligh...

Descripción completa

Detalles Bibliográficos
Autores principales: Krupa, M, Alves, D, Gasior, M, Kral, J, Levens, T, Schramm, V, Wendt, M, Zamantzas, C
Lenguaje:eng
Publicado: 2019
Acceso en línea:http://cds.cern.ch/record/2750284
Descripción
Sumario:This papers reviews the implemented improvements, operational experience, and performance reach of the major LHC Beam Instrumentation systems, excluding transverse beam profile diagnostics, throughout the LHC Run 2. The major hardware and software changes since the Long Shutdown 1 (LS1) are highlighted and the main actions addressing the remaining open issues during the Long Shutdown 2 (LS2) are listed. An outlook for the post-LS2 commissioning is provided based on the experience gained during the Run 2 commissioning period.