Cargando…

Run 2 Overview of the LHC Beam Instrumentation

This papers reviews the implemented improvements, operational experience, and performance reach of the major LHC Beam Instrumentation systems, excluding transverse beam profile diagnostics, throughout the LHC Run 2. The major hardware and software changes since the Long Shutdown 1 (LS1) are highligh...

Descripción completa

Detalles Bibliográficos
Autores principales: Krupa, M, Alves, D, Gasior, M, Kral, J, Levens, T, Schramm, V, Wendt, M, Zamantzas, C
Lenguaje:eng
Publicado: 2019
Acceso en línea:http://cds.cern.ch/record/2750284
_version_ 1780969124800757760
author Krupa, M
Alves, D
Gasior, M
Kral, J
Levens, T
Schramm, V
Wendt, M
Zamantzas, C
author_facet Krupa, M
Alves, D
Gasior, M
Kral, J
Levens, T
Schramm, V
Wendt, M
Zamantzas, C
author_sort Krupa, M
collection CERN
description This papers reviews the implemented improvements, operational experience, and performance reach of the major LHC Beam Instrumentation systems, excluding transverse beam profile diagnostics, throughout the LHC Run 2. The major hardware and software changes since the Long Shutdown 1 (LS1) are highlighted and the main actions addressing the remaining open issues during the Long Shutdown 2 (LS2) are listed. An outlook for the post-LS2 commissioning is provided based on the experience gained during the Run 2 commissioning period.
id oai-inspirehep.net-1842531
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-18425312021-05-11T13:18:24Zhttp://cds.cern.ch/record/2750284engKrupa, MAlves, DGasior, MKral, JLevens, TSchramm, VWendt, MZamantzas, CRun 2 Overview of the LHC Beam InstrumentationThis papers reviews the implemented improvements, operational experience, and performance reach of the major LHC Beam Instrumentation systems, excluding transverse beam profile diagnostics, throughout the LHC Run 2. The major hardware and software changes since the Long Shutdown 1 (LS1) are highlighted and the main actions addressing the remaining open issues during the Long Shutdown 2 (LS2) are listed. An outlook for the post-LS2 commissioning is provided based on the experience gained during the Run 2 commissioning period.oai:inspirehep.net:18425312019
spellingShingle Krupa, M
Alves, D
Gasior, M
Kral, J
Levens, T
Schramm, V
Wendt, M
Zamantzas, C
Run 2 Overview of the LHC Beam Instrumentation
title Run 2 Overview of the LHC Beam Instrumentation
title_full Run 2 Overview of the LHC Beam Instrumentation
title_fullStr Run 2 Overview of the LHC Beam Instrumentation
title_full_unstemmed Run 2 Overview of the LHC Beam Instrumentation
title_short Run 2 Overview of the LHC Beam Instrumentation
title_sort run 2 overview of the lhc beam instrumentation
url http://cds.cern.ch/record/2750284
work_keys_str_mv AT krupam run2overviewofthelhcbeaminstrumentation
AT alvesd run2overviewofthelhcbeaminstrumentation
AT gasiorm run2overviewofthelhcbeaminstrumentation
AT kralj run2overviewofthelhcbeaminstrumentation
AT levenst run2overviewofthelhcbeaminstrumentation
AT schrammv run2overviewofthelhcbeaminstrumentation
AT wendtm run2overviewofthelhcbeaminstrumentation
AT zamantzasc run2overviewofthelhcbeaminstrumentation