LBDS Performance in RUN 2
The performance of the LHC Beam Dump System (LBDS) during Run 2 beam operations are presented in terms of rate and type of failures of the extraction (MKB) and dump (MKD) kickers. New faults were also identified and they are described together with their impact on the beam distribution at the dump p...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750287 |
Sumario: | The performance of the LHC Beam Dump System (LBDS) during Run 2 beam operations
are presented in terms of rate and type of failures of the extraction (MKB) and
dump (MKD) kickers. New faults were also identified and they are described
together with their impact on the beam distribution at the dump protection
elements and the TDE assembly. Foreseen and proposed mitigations, on the MKB/MKD
magnets, generators, and controls, in order to minimise possible beam intensity
and brightness limitations, are addressed. The reasons and functionality of the
BETS TCDQ are reminded together with the present operational constraints, which
will still hold in Run 3. Main changes and issues encountered with the XPOC
analysis and acknowledgment procedure are treated. Updates are given on the
operational experience with the variable AGK after the accidental injection of
bunches in the abort gap in 2017. The evolution of the execution and validation
procedure for the asynchronous beam dump test and the further planned
improvements are covered. Finally, recommendations are given for a proper
scheduling of the LBDS commissioning time after LS2. |
---|