LHC Dump Assembly - Operational Feedback and Future Prospective

The current LHC external beam dumps (TDE, Target Dump External) are operational since 2008. The dump cores are 7.6 m long and made up of different grades of graphite, enclosed in a duplex stainless steel vessel, welded together in different sections. The core itself is part of a longer assembly imme...

Descripción completa

Detalles Bibliográficos
Autores principales: Perillo-Marcone, A, Calviani, M, Grenier, D, Kershaw, K, Polzin, T
Lenguaje:eng
Publicado: 2019
Acceso en línea:http://cds.cern.ch/record/2750288
_version_ 1780969125662687232
author Perillo-Marcone, A
Calviani, M
Grenier, D
Kershaw, K
Polzin, T
author_facet Perillo-Marcone, A
Calviani, M
Grenier, D
Kershaw, K
Polzin, T
author_sort Perillo-Marcone, A
collection CERN
description The current LHC external beam dumps (TDE, Target Dump External) are operational since 2008. The dump cores are 7.6 m long and made up of different grades of graphite, enclosed in a duplex stainless steel vessel, welded together in different sections. The core itself is part of a longer assembly immersed in a nitrogen atmosphere, delimited by a thin stainless steel sheet upstream and a pure titanium disk downstream. Since end of 2015 a series of leaks of nitrogen have been observed. Leaks have occurred in all the gaskets upstream of the dumps (both UD62 and UD68) as well as in the downstream window for one of the two operational dumps (UD68). This presentation summarises the type of leaks observed and corrective measures taken during Run 2, together with the vibration and displacement measurements performed to analyse the behaviour of the device during beam dumping. Different upgrades are proposed to be implemented during LS2, aiming at increasing the reliability of the assembly and hence, reducing corrective interventions or eventual machine downtime. Additionally, numerical simulations are shown in order to analyse the risk of failure of the upstream and downstream windows under different beam dumping scenarios, including Run 2, Run 3 and HiLumi beams, under normal operation or in case of partial dilution failure. Considerations about the possibility to reach 1.8E11 during Run3 will be provided, together with upgrade proposals.
id oai-inspirehep.net-1842535
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-18425352021-05-11T13:18:25Zhttp://cds.cern.ch/record/2750288engPerillo-Marcone, ACalviani, MGrenier, DKershaw, KPolzin, TLHC Dump Assembly - Operational Feedback and Future ProspectiveThe current LHC external beam dumps (TDE, Target Dump External) are operational since 2008. The dump cores are 7.6 m long and made up of different grades of graphite, enclosed in a duplex stainless steel vessel, welded together in different sections. The core itself is part of a longer assembly immersed in a nitrogen atmosphere, delimited by a thin stainless steel sheet upstream and a pure titanium disk downstream. Since end of 2015 a series of leaks of nitrogen have been observed. Leaks have occurred in all the gaskets upstream of the dumps (both UD62 and UD68) as well as in the downstream window for one of the two operational dumps (UD68). This presentation summarises the type of leaks observed and corrective measures taken during Run 2, together with the vibration and displacement measurements performed to analyse the behaviour of the device during beam dumping. Different upgrades are proposed to be implemented during LS2, aiming at increasing the reliability of the assembly and hence, reducing corrective interventions or eventual machine downtime. Additionally, numerical simulations are shown in order to analyse the risk of failure of the upstream and downstream windows under different beam dumping scenarios, including Run 2, Run 3 and HiLumi beams, under normal operation or in case of partial dilution failure. Considerations about the possibility to reach 1.8E11 during Run3 will be provided, together with upgrade proposals.oai:inspirehep.net:18425352019
spellingShingle Perillo-Marcone, A
Calviani, M
Grenier, D
Kershaw, K
Polzin, T
LHC Dump Assembly - Operational Feedback and Future Prospective
title LHC Dump Assembly - Operational Feedback and Future Prospective
title_full LHC Dump Assembly - Operational Feedback and Future Prospective
title_fullStr LHC Dump Assembly - Operational Feedback and Future Prospective
title_full_unstemmed LHC Dump Assembly - Operational Feedback and Future Prospective
title_short LHC Dump Assembly - Operational Feedback and Future Prospective
title_sort lhc dump assembly - operational feedback and future prospective
url http://cds.cern.ch/record/2750288
work_keys_str_mv AT perillomarconea lhcdumpassemblyoperationalfeedbackandfutureprospective
AT calvianim lhcdumpassemblyoperationalfeedbackandfutureprospective
AT grenierd lhcdumpassemblyoperationalfeedbackandfutureprospective
AT kershawk lhcdumpassemblyoperationalfeedbackandfutureprospective
AT polzint lhcdumpassemblyoperationalfeedbackandfutureprospective