Cargando…
LHC Dump Assembly - Operational Feedback and Future Prospective
The current LHC external beam dumps (TDE, Target Dump External) are operational since 2008. The dump cores are 7.6 m long and made up of different grades of graphite, enclosed in a duplex stainless steel vessel, welded together in different sections. The core itself is part of a longer assembly imme...
Autores principales: | Perillo-Marcone, A, Calviani, M, Grenier, D, Kershaw, K, Polzin, T |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750288 |
Ejemplares similares
-
Analysis and Operational Feedback of the New High-Energy Beam Dump in the CERN SPS
por: Perillo-Marcone, Antonio, et al.
Publicado: (2018) -
Design of the New PS Internal Dumps, in the Framework of the LHC Injector Upgrade (LIU) Project
por: Romagnoli, Giulia, et al.
Publicado: (2017) -
Sigraflex® Studies for LHC CERN Beam Dump: Summary and Perspective
por: Heredia, Jorge, et al.
Publicado: (2021) -
Design and behaviour of the Large Hadron Collider external beam dumps capable of receiving 539 MJ/dump
por: Maestre, J., et al.
Publicado: (2021) -
Design of the Future High Energy Beam Dump for the CERN SPS
por: Pianese, Stefano, et al.
Publicado: (2018)