Cargando…
Special Losses during LHC Run 2
A comprehensive review of special beam loss scenarios during Run 2 is presented, with main focus on studies and actions taken to mitigate their impact on LHC operations. An overview of Beam Loss Monitor (BLM) threshold strategy aimed at reducing the machine downtime caused by the interaction of the...
Autores principales: | Mirarchi, D, Arduini, G, Giovannozzi, M, Lechner, A, Redaelli, S, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750296 |
Ejemplares similares
-
LHC Run 2: Results and challenges
por: Bruce, Roderik, et al.
Publicado: (2016) -
Baseline LHC machine parameters and configuration of the 2015 proton run
por: Bruce, R., et al.
Publicado: (2014) -
What can be learnt in RUN 2 for RUN 3 and HL-LHC RUNS
por: Arduini, G, et al.
Publicado: (2017) -
Strategy for the first two months of the LHC beam commissioning and key early measurements
por: Redaelli, S, et al.
Publicado: (2014) -
Strategy for First Two Months of LHC Beam Commissioning (Commissioning to First Stable Beams)
por: Redaelli, S, et al.
Publicado: (2015)