What to expect from the injectors during Run 3

During LS2 the LHC injectors will undergo an important upgrade campaign under the LHC Injectors Upgrade (LIU) project. Linac2 will be replaced by Linac4 and additional hardware will be installed in all the synchrotrons of the LHC injectors chain to enable the production of proton beams of double int...

Descripción completa

Detalles Bibliográficos
Autores principales: Rumolo, G, Bartosik, H, Kain, V, Meddahi, M
Lenguaje:eng
Publicado: 2019
Acceso en línea:http://cds.cern.ch/record/2750418
_version_ 1780969129107259392
author Rumolo, G
Bartosik, H
Kain, V
Meddahi, M
author_facet Rumolo, G
Bartosik, H
Kain, V
Meddahi, M
author_sort Rumolo, G
collection CERN
description During LS2 the LHC injectors will undergo an important upgrade campaign under the LHC Injectors Upgrade (LIU) project. Linac2 will be replaced by Linac4 and additional hardware will be installed in all the synchrotrons of the LHC injectors chain to enable the production of proton beams of double intensity and brightness to be delivered to LHC in the HL-LHC era (i.e. after LS3). The lead (Pb) ion beams, which have already shown their potential to fulfil the HL-LHC goal in terms of single bunch parameters at the LHC injection, will see their bunch number roughly doubled in the LHC thanks to momentum slip stacking in the SPS. The planned evolution of the beam parameters during Run 3 can be summarised as follows. All pre-LS2 proton beams will be recovered by the end of 2021, while intensity and brightness of the LHC beams will be gradually ramped up to the LIU values throughout 2022-2024. The commissioning of momentum slip stacking in the SPS for Pb ions is expected to take place in 2021 to allow delivery of LIU ion beams to LHC for the 2021 Pb-Pb run.
id oai-inspirehep.net-1842551
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-18425512021-05-11T13:18:28Zhttp://cds.cern.ch/record/2750418engRumolo, GBartosik, HKain, VMeddahi, MWhat to expect from the injectors during Run 3During LS2 the LHC injectors will undergo an important upgrade campaign under the LHC Injectors Upgrade (LIU) project. Linac2 will be replaced by Linac4 and additional hardware will be installed in all the synchrotrons of the LHC injectors chain to enable the production of proton beams of double intensity and brightness to be delivered to LHC in the HL-LHC era (i.e. after LS3). The lead (Pb) ion beams, which have already shown their potential to fulfil the HL-LHC goal in terms of single bunch parameters at the LHC injection, will see their bunch number roughly doubled in the LHC thanks to momentum slip stacking in the SPS. The planned evolution of the beam parameters during Run 3 can be summarised as follows. All pre-LS2 proton beams will be recovered by the end of 2021, while intensity and brightness of the LHC beams will be gradually ramped up to the LIU values throughout 2022-2024. The commissioning of momentum slip stacking in the SPS for Pb ions is expected to take place in 2021 to allow delivery of LIU ion beams to LHC for the 2021 Pb-Pb run.oai:inspirehep.net:18425512019
spellingShingle Rumolo, G
Bartosik, H
Kain, V
Meddahi, M
What to expect from the injectors during Run 3
title What to expect from the injectors during Run 3
title_full What to expect from the injectors during Run 3
title_fullStr What to expect from the injectors during Run 3
title_full_unstemmed What to expect from the injectors during Run 3
title_short What to expect from the injectors during Run 3
title_sort what to expect from the injectors during run 3
url http://cds.cern.ch/record/2750418
work_keys_str_mv AT rumolog whattoexpectfromtheinjectorsduringrun3
AT bartosikh whattoexpectfromtheinjectorsduringrun3
AT kainv whattoexpectfromtheinjectorsduringrun3
AT meddahim whattoexpectfromtheinjectorsduringrun3