Cargando…
What to expect from the injectors during Run 3
During LS2 the LHC injectors will undergo an important upgrade campaign under the LHC Injectors Upgrade (LIU) project. Linac2 will be replaced by Linac4 and additional hardware will be installed in all the synchrotrons of the LHC injectors chain to enable the production of proton beams of double int...
Autores principales: | Rumolo, G, Bartosik, H, Kain, V, Meddahi, M |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750418 |
Ejemplares similares
-
Beams from the injectors
por: Bartosik, H, et al.
Publicado: (2017) -
Injectors Beam Performance Evolution during Run 2
por: Bartosik, H, et al.
Publicado: (2019) -
Expected performance in the injectors at 25 ns without and with Linac4
por: Rumolo, G, et al.
Publicado: (2014) -
Beams in the injectors
por: Bartosik, H, et al.
Publicado: (2014) -
Necessary LIU studies in the injectors during 2012
por: Rumolo, G, et al.
Publicado: (2012)