Cargando…
LHC Run 3 Configuration Working Group Report
After its second successful run period, the Large Hadron Collider (LHC) [1] shuts down for two years with the plan of being recommissioned in 2021 for a three-year physics production period, the Run 3. The future restart of the LHC coincides with the completion of the LHC Injectors Upgrade (LIU) pro...
Autores principales: | Karastathis, N, Barnes, M, Bartosik, H, Brodzinski, K, Buffat, X, Cerutti, F, Fartoukh, S, Goddard, B, Iadarola, G, Naour, S Le, Lechner, A, Heredia, J Maestre, Mereghetti, A, Metral, E, Missiaen, D, Mounet, N, Nuiry, F X, Papadopoulou, S, Papaphilippou, Y, Petersen, B, Rumolo, G, Salvant, B, Schwick, C, Camillocci, M Solfaroli, Sterbini, G, Timko, H, Garcia, R Tomas, Uythoven, J, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750302 |
Ejemplares similares
-
LHC Configuration and Operational Scenario for Run 3
por: Fartoukh, Stephane, et al.
Publicado: (2021) -
Impedance effects on beam stability
por: Mounet, N, et al.
Publicado: (2012) -
6L2: Operation, Observations and Physics Aspects
por: Mether, L, et al.
Publicado: (2019) -
Incoherent Beam-Beam Effects and Lifetime Optimisation
por: Pellegrini, D, et al.
Publicado: (2019) -
Impedance and instabilities
por: Mounet, N, et al.
Publicado: (2014)