Chapter 15: Integration, (de-)installation and alignment
The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.269 http://cds.cern.ch/record/2750423 |
Sumario: | The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8.
Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be operational for LHC Run 3, while the largest part of the interventions will take place in Long Shutdown 3 (LS3) and they will affect primarily P1, P4, P5, P6 and P7. The activities required point by point will be therefore listed and analysed here below. |
---|