Chapter 15: Integration, (de-)installation and alignment

The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be...

Descripción completa

Detalles Bibliográficos
Autores principales: Fessia, Paolo, Mainaud Durand, Helene
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.23731/CYRM-2020-0010.269
http://cds.cern.ch/record/2750423
_version_ 1780969130600431616
author Fessia, Paolo
Mainaud Durand, Helene
author_facet Fessia, Paolo
Mainaud Durand, Helene
author_sort Fessia, Paolo
collection CERN
description The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be operational for LHC Run 3, while the largest part of the interventions will take place in Long Shutdown 3 (LS3) and they will affect primarily P1, P4, P5, P6 and P7. The activities required point by point will be therefore listed and analysed here below.
id oai-inspirehep.net-1842569
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-18425692021-03-24T14:09:26Zdoi:10.23731/CYRM-2020-0010.269http://cds.cern.ch/record/2750423engFessia, PaoloMainaud Durand, HeleneChapter 15: Integration, (de-)installation and alignmentAccelerators and Storage RingsThe HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be operational for LHC Run 3, while the largest part of the interventions will take place in Long Shutdown 3 (LS3) and they will affect primarily P1, P4, P5, P6 and P7. The activities required point by point will be therefore listed and analysed here below.oai:inspirehep.net:18425692020
spellingShingle Accelerators and Storage Rings
Fessia, Paolo
Mainaud Durand, Helene
Chapter 15: Integration, (de-)installation and alignment
title Chapter 15: Integration, (de-)installation and alignment
title_full Chapter 15: Integration, (de-)installation and alignment
title_fullStr Chapter 15: Integration, (de-)installation and alignment
title_full_unstemmed Chapter 15: Integration, (de-)installation and alignment
title_short Chapter 15: Integration, (de-)installation and alignment
title_sort chapter 15: integration, (de-)installation and alignment
topic Accelerators and Storage Rings
url https://dx.doi.org/10.23731/CYRM-2020-0010.269
http://cds.cern.ch/record/2750423
work_keys_str_mv AT fessiapaolo chapter15integrationdeinstallationandalignment
AT mainauddurandhelene chapter15integrationdeinstallationandalignment