Chapter 15: Integration, (de-)installation and alignment
The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.269 http://cds.cern.ch/record/2750423 |
_version_ | 1780969130600431616 |
---|---|
author | Fessia, Paolo Mainaud Durand, Helene |
author_facet | Fessia, Paolo Mainaud Durand, Helene |
author_sort | Fessia, Paolo |
collection | CERN |
description | The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8.
Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be operational for LHC Run 3, while the largest part of the interventions will take place in Long Shutdown 3 (LS3) and they will affect primarily P1, P4, P5, P6 and P7. The activities required point by point will be therefore listed and analysed here below. |
id | oai-inspirehep.net-1842569 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2020 |
record_format | invenio |
spelling | oai-inspirehep.net-18425692021-03-24T14:09:26Zdoi:10.23731/CYRM-2020-0010.269http://cds.cern.ch/record/2750423engFessia, PaoloMainaud Durand, HeleneChapter 15: Integration, (de-)installation and alignmentAccelerators and Storage RingsThe HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be operational for LHC Run 3, while the largest part of the interventions will take place in Long Shutdown 3 (LS3) and they will affect primarily P1, P4, P5, P6 and P7. The activities required point by point will be therefore listed and analysed here below.oai:inspirehep.net:18425692020 |
spellingShingle | Accelerators and Storage Rings Fessia, Paolo Mainaud Durand, Helene Chapter 15: Integration, (de-)installation and alignment |
title | Chapter 15: Integration, (de-)installation and alignment |
title_full | Chapter 15: Integration, (de-)installation and alignment |
title_fullStr | Chapter 15: Integration, (de-)installation and alignment |
title_full_unstemmed | Chapter 15: Integration, (de-)installation and alignment |
title_short | Chapter 15: Integration, (de-)installation and alignment |
title_sort | chapter 15: integration, (de-)installation and alignment |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.23731/CYRM-2020-0010.269 http://cds.cern.ch/record/2750423 |
work_keys_str_mv | AT fessiapaolo chapter15integrationdeinstallationandalignment AT mainauddurandhelene chapter15integrationdeinstallationandalignment |