Cargando…
Chapter 15: Integration, (de-)installation and alignment
The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be...
Autores principales: | Fessia, Paolo, Mainaud Durand, Helene |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.269 http://cds.cern.ch/record/2750423 |
Ejemplares similares
-
Chapter 15: Integration and (De-)installation
por: Fessia, P., et al.
Publicado: (2015) -
The New CLIC Main Linac Installation and Alignment Strategy
por: Mainaud Durand, Helene, et al.
Publicado: (2018) -
HL-LHC full remote alignment study
por: Herty, Andreas, et al.
Publicado: (2019) -
PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer scale)
por: Caalan-Lasheras, Nuria, et al.
Publicado: (2013) -
Micrometric Propagation of Error Using Overlapping Streched Wires for the CLIC Pre-Alignment
por: Mainaud Durand, Helene, et al.
Publicado: (2017)