Cargando…

Chapter 14: Beam injection and dumping systems

The beam transfer into the LHC is achieved by the two transfer lines TI2 and TI8, together with the septum and injection kickers, plus associated systems to ensure the protection of the LHC elements in case of a mis- steered beam. The foreseen increase in injected intensity and brightness for the HL...

Descripción completa

Detalles Bibliográficos
Autores principales: Bracco, Chiara, Barnes, Michael J, Lechner, Anton
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.23731/CYRM-2020-0010.259
http://cds.cern.ch/record/2750424
Descripción
Sumario:The beam transfer into the LHC is achieved by the two transfer lines TI2 and TI8, together with the septum and injection kickers, plus associated systems to ensure the protection of the LHC elements in case of a mis- steered beam. The foreseen increase in injected intensity and brightness for the HL-LHC means that the protection functionality of the beam-intercepting devices (TDI) needs upgrading. In addition, the higher beam current significantly increases the beam-induced power deposited in many elements, including the injection kicker magnets in the LHC ring. The beam dumping system is also based on DC septa and fast kickers, with various beam intercepting protection devices including the beam dump block. Again, the significant change in the beam parameters for the HL-LHC implies redesign of several of the dump system devices, both because of the increased energy deposition in the case of direct impact and because of increased radiation background that could affect the reliability of this key machine protection system.