Cargando…
Chapter 6: Circuit layout, powering and protection
During LS2 and LS3, the HL-LHC upgrade will impose many changes to the magnet circuits of the LHC long- straight sections at points 1 and 5. The magnets will be installed in the machine during LS3. In addition to these changes, during LS2, two main dipole magnets (MB) will be replaced by 11T cryo-as...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.115 http://cds.cern.ch/record/2750433 |
_version_ | 1780969132756303872 |
---|---|
author | Rodríguez Mateos, F Catalão Rolhas da Rosa, T D Menéndez Cámara, F Yammine, S Zerlauth, Markus |
author_facet | Rodríguez Mateos, F Catalão Rolhas da Rosa, T D Menéndez Cámara, F Yammine, S Zerlauth, Markus |
author_sort | Rodríguez Mateos, F |
collection | CERN |
description | During LS2 and LS3, the HL-LHC upgrade will impose many changes to the magnet circuits of the LHC long- straight sections at points 1 and 5. The magnets will be installed in the machine during LS3. In addition to these changes, during LS2, two main dipole magnets (MB) will be replaced by 11T cryo-assemblies (MBH) in order to allow the addition of two extra collimators at warm to intercept dispersive beam losses originating from the collimation system installed in point 7. The two concerned dipole magnets that are to be replaced are MBB.A9L7 and MBA.A9R7. |
id | oai-inspirehep.net-1842579 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2020 |
record_format | invenio |
spelling | oai-inspirehep.net-18425792021-03-24T14:01:56Zdoi:10.23731/CYRM-2020-0010.115http://cds.cern.ch/record/2750433engRodríguez Mateos, FCatalão Rolhas da Rosa, T DMenéndez Cámara, FYammine, SZerlauth, MarkusChapter 6: Circuit layout, powering and protectionAccelerators and Storage RingsDuring LS2 and LS3, the HL-LHC upgrade will impose many changes to the magnet circuits of the LHC long- straight sections at points 1 and 5. The magnets will be installed in the machine during LS3. In addition to these changes, during LS2, two main dipole magnets (MB) will be replaced by 11T cryo-assemblies (MBH) in order to allow the addition of two extra collimators at warm to intercept dispersive beam losses originating from the collimation system installed in point 7. The two concerned dipole magnets that are to be replaced are MBB.A9L7 and MBA.A9R7.oai:inspirehep.net:18425792020 |
spellingShingle | Accelerators and Storage Rings Rodríguez Mateos, F Catalão Rolhas da Rosa, T D Menéndez Cámara, F Yammine, S Zerlauth, Markus Chapter 6: Circuit layout, powering and protection |
title | Chapter 6: Circuit layout, powering and protection |
title_full | Chapter 6: Circuit layout, powering and protection |
title_fullStr | Chapter 6: Circuit layout, powering and protection |
title_full_unstemmed | Chapter 6: Circuit layout, powering and protection |
title_short | Chapter 6: Circuit layout, powering and protection |
title_sort | chapter 6: circuit layout, powering and protection |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.23731/CYRM-2020-0010.115 http://cds.cern.ch/record/2750433 |
work_keys_str_mv | AT rodriguezmateosf chapter6circuitlayoutpoweringandprotection AT catalaorolhasdarosatd chapter6circuitlayoutpoweringandprotection AT menendezcamaraf chapter6circuitlayoutpoweringandprotection AT yammines chapter6circuitlayoutpoweringandprotection AT zerlauthmarkus chapter6circuitlayoutpoweringandprotection |