Cargando…

Chapter 3: Insertion Magnets

In general, magnets will be tested individually in a vertical test station, and then horizontally in the final cold mass assembly within the final cryostat, with the exception of Q2 and D2 whose length does not allow vertical testing. Many power tests will be done in laboratories collaborating with...

Descripción completa

Detalles Bibliográficos
Autores principales: Todesco, E, Ferracin, P
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.23731/CYRM-2020-0010.47
http://cds.cern.ch/record/2750436
_version_ 1780969133408518144
author Todesco, E
Ferracin, P
author_facet Todesco, E
Ferracin, P
author_sort Todesco, E
collection CERN
description In general, magnets will be tested individually in a vertical test station, and then horizontally in the final cold mass assembly within the final cryostat, with the exception of Q2 and D2 whose length does not allow vertical testing. Many power tests will be done in laboratories collaborating with CERN (BNL for vertical test of Q1/Q3, FNAL for horizontal test of Q1/Q3, KEK for vertical test of D1, LASA for vertical test of high order correctors, IMP (Lanzhou-China) for vertical test of D2 correctors, FREIA (Univ. of Uppsala, Sweden) for vertical test of MCBXFB. For the D2 correctors and for the high order correctors, performance shall be assessed in LASA and IMP at 4.5 K. All test will require reaching the so-called ultimate current, corresponding to operation in the HL-LHC at 7.5 TeV. All main magnets will undergo a thermal cycle to verify the training. A string including the magnets from Q1 to D1 will be assembled in the CERN test facility (SM18) and tested prior to the installation of the HL-LHC components in the LHC tunnel.
id oai-inspirehep.net-1842582
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-18425822021-03-24T13:59:35Zdoi:10.23731/CYRM-2020-0010.47http://cds.cern.ch/record/2750436engTodesco, EFerracin, PChapter 3: Insertion MagnetsAccelerators and Storage RingsIn general, magnets will be tested individually in a vertical test station, and then horizontally in the final cold mass assembly within the final cryostat, with the exception of Q2 and D2 whose length does not allow vertical testing. Many power tests will be done in laboratories collaborating with CERN (BNL for vertical test of Q1/Q3, FNAL for horizontal test of Q1/Q3, KEK for vertical test of D1, LASA for vertical test of high order correctors, IMP (Lanzhou-China) for vertical test of D2 correctors, FREIA (Univ. of Uppsala, Sweden) for vertical test of MCBXFB. For the D2 correctors and for the high order correctors, performance shall be assessed in LASA and IMP at 4.5 K. All test will require reaching the so-called ultimate current, corresponding to operation in the HL-LHC at 7.5 TeV. All main magnets will undergo a thermal cycle to verify the training. A string including the magnets from Q1 to D1 will be assembled in the CERN test facility (SM18) and tested prior to the installation of the HL-LHC components in the LHC tunnel.oai:inspirehep.net:18425822020
spellingShingle Accelerators and Storage Rings
Todesco, E
Ferracin, P
Chapter 3: Insertion Magnets
title Chapter 3: Insertion Magnets
title_full Chapter 3: Insertion Magnets
title_fullStr Chapter 3: Insertion Magnets
title_full_unstemmed Chapter 3: Insertion Magnets
title_short Chapter 3: Insertion Magnets
title_sort chapter 3: insertion magnets
topic Accelerators and Storage Rings
url https://dx.doi.org/10.23731/CYRM-2020-0010.47
http://cds.cern.ch/record/2750436
work_keys_str_mv AT todescoe chapter3insertionmagnets
AT ferracinp chapter3insertionmagnets