Cargando…
Chapter 2: Machine layout and performance
The goal of the High-luminosity upgrade of the LHC is to deliver an integrated luminosity of at least 250 fb-1 per year (assuming at least 160 days of operation at high-luminosity) in each of the two high-luminosity general-purpose detectors, ATLAS and CMS, located at the interaction points (IP) 1 a...
Autores principales: | Arduini, G, Bruce, R, De Maria, R, Giovannozzi, M, Iadarola, G, Jowett, J, Métral, E, Papaphilippou, Y, Garcia, R Tomás |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.17 http://cds.cern.ch/record/2750438 |
Ejemplares similares
-
Chapter 2: Machine Layout and Performance
por: Angal-Kalinin, D., et al.
Publicado: (2015) -
Chapter 6: Circuit layout, powering and protection
por: Rodríguez Mateos, F, et al.
Publicado: (2020) -
Baseline LHC machine parameters and configuration of the 2015 proton run
por: Bruce, R., et al.
Publicado: (2014) -
Non-Linear Beam Dynamics Tests at the CERN PS in the Framework of the Multi-Turn Extraction
por: Arduini, G, et al.
Publicado: (2012) -
Collimator Layouts for HL-LHC in the Experimental Insertions
por: Bruce, R, et al.
Publicado: (2015)