Cargando…
Chapter 2: Machine layout and performance
The goal of the High-luminosity upgrade of the LHC is to deliver an integrated luminosity of at least 250 fb-1 per year (assuming at least 160 days of operation at high-luminosity) in each of the two high-luminosity general-purpose detectors, ATLAS and CMS, located at the interaction points (IP) 1 a...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.23731/CYRM-2020-0010.17 http://cds.cern.ch/record/2750438 |
Search Result 1
Enlace del recurso
por Angal-Kalinin, D., Appleby, R, Arduini, G, Banfi, D, Barranco, J, Biancacci, N, Brett, D, Bruce, R, Brüning, O, Buffat, X, Burov, A, Cai, Y, Calaga, R, Chancé, A, Crouch, M, Dalena, B, Day, H, de Maria, R, Esteban Muller, J, Fartoukh, S, Fitterer, M, Frasciello, O, Giovannozzi, M, Herr, W, Höfle, W, Holzer, B, Iadarola, G, Jowett, J.M., Korostelev, M, Li, K, McIntosh, E, Métral, E, Mostacci, A, Mounet, N, Muratori, B, Nosochkov, Y, Ohmi, K, Papaphilippou, Y, Paret, S, Payet, J, Pieloni, T, Qiang, J, Rijoff, T, Rossi, L, Rumolo, G, Salvant, B, Schaumann, M, Shaposhnikova, E, Shatilov, D, Tambasco, C, Tomás, R, Valishev, A, Wang, M -H, Wanzenberg, R, White, S, Wolski, A, Zagorodnova, O, Zannini, C, Zimmermann, F, Zobov, M
Publicado 2015
Enlace del recurso
Publicado 2015
Enlace del recurso