Cargando…
Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project
The U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quadrupoles for the Hi-Lumi LHC upgrade. The US national laboratories in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets ar...
Autores principales: | , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2021.3053510 http://cds.cern.ch/record/2759166 |
_version_ | 1780970289389109248 |
---|---|
author | Song, Honghai Ambrosio, Giorgio Amm, Kathleen Anerella, Michael Apollinari, Giorgio Cheng, Daniel Chlachidze, Guram DiMarco, Joseph Feher, Sandor Ferracin, Paolo Izquierdo Bermudez, Susana Jain, Animesh Joshi, Piyush Muratore, Joseph Pan, Heng Sabbi, GianLuca Schmalzle, Jesse Todesco, Ezio Wanderer, Peter Wang, Xiaorong Yu, Miao |
author_facet | Song, Honghai Ambrosio, Giorgio Amm, Kathleen Anerella, Michael Apollinari, Giorgio Cheng, Daniel Chlachidze, Guram DiMarco, Joseph Feher, Sandor Ferracin, Paolo Izquierdo Bermudez, Susana Jain, Animesh Joshi, Piyush Muratore, Joseph Pan, Heng Sabbi, GianLuca Schmalzle, Jesse Todesco, Ezio Wanderer, Peter Wang, Xiaorong Yu, Miao |
author_sort | Song, Honghai |
collection | CERN |
description | The U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quadrupoles for the Hi-Lumi LHC upgrade. The US national laboratories in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets are made of Nb3Sn conductors, with large aperture (150 mm) and integrated gradient of 556.9 T. This paper reports on magnetic measurements performed during the vertical test at Brookhaven National Laboratory (BNL) in 2019-2020. A warm measurement Z-Scan (+/−15 A) with 42 Z-positions before cool-down was performed at BNL. The results were directly compared to field data measured at LBNL during magnet assembly. Measured harmonics and magnetic center offsets (ΔX and ΔY) have provided timely and informative diagnostics on the magnet structure's shape at both warm and cold temperatures. A new centering fixture was designed and added to better center the warm bore tube which contains the rotating coil probe. After the quench training to 16.47 kA was achieved, a complete set of cold measurements (Z-Scan at 16.47 kA and I-Scan from 960 A to 16.47 kA and back to 960 A) was made. Periodic axial variation of allowed and nonallowed harmonics was observed which is related to the coil radial and/or mid-plane variations along the magnet axis. Overall, the average harmonics in the straight section are within the required field boundaries. |
id | oai-inspirehep.net-1845761 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | oai-inspirehep.net-18457612021-04-20T14:20:45Zdoi:10.1109/TASC.2021.3053510http://cds.cern.ch/record/2759166engSong, HonghaiAmbrosio, GiorgioAmm, KathleenAnerella, MichaelApollinari, GiorgioCheng, DanielChlachidze, GuramDiMarco, JosephFeher, SandorFerracin, PaoloIzquierdo Bermudez, SusanaJain, AnimeshJoshi, PiyushMuratore, JosephPan, HengSabbi, GianLucaSchmalzle, JesseTodesco, EzioWanderer, PeterWang, XiaorongYu, MiaoMagnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC ProjectAccelerators and Storage RingsThe U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quadrupoles for the Hi-Lumi LHC upgrade. The US national laboratories in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets are made of Nb3Sn conductors, with large aperture (150 mm) and integrated gradient of 556.9 T. This paper reports on magnetic measurements performed during the vertical test at Brookhaven National Laboratory (BNL) in 2019-2020. A warm measurement Z-Scan (+/−15 A) with 42 Z-positions before cool-down was performed at BNL. The results were directly compared to field data measured at LBNL during magnet assembly. Measured harmonics and magnetic center offsets (ΔX and ΔY) have provided timely and informative diagnostics on the magnet structure's shape at both warm and cold temperatures. A new centering fixture was designed and added to better center the warm bore tube which contains the rotating coil probe. After the quench training to 16.47 kA was achieved, a complete set of cold measurements (Z-Scan at 16.47 kA and I-Scan from 960 A to 16.47 kA and back to 960 A) was made. Periodic axial variation of allowed and nonallowed harmonics was observed which is related to the coil radial and/or mid-plane variations along the magnet axis. Overall, the average harmonics in the straight section are within the required field boundaries.The U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quad-rupoles for the Hi-Lumi LHC upgrade. The US national laborato-ries in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets are made of Nb3Sn conductors, with large aperture (150 mm) and in-tegrated gradient of 556.9 T. This paper reports on magnetic measurements performed during the vertical test at Brookhaven National Laboratory (BNL) in 2019-2020. A warm measurement Z-Scan (+/- 15 A) with 42 Z-positions before cool-down was per-formed at BNL. The results were directly compared to field data measured at LBNL during magnet assembly. Measured harmonics and magnetic center offsets (ΔX and ΔY) have provided timely and informative diagnostics on the magnet structure’s shape at both warm and cold temperatures. A new centering fixture was de-signed and added to better center the warm bore tube which con-tains the rotating coil probe. After the quench training to 16.47 kA was achieved, a complete set of cold measurements (Z-Scan at 16.47 kA and I-Scan from 960 A to 16.47 kA and back to 960 A) was made. Periodic axial variation of allowed and nonallowed harmonics was observed which is related to the coil radial and/or mid-plane variations along the magnet axis. Overall, the average harmonics in the straight section are within the required field boundaries.FERMILAB-PUB-21-038-TDoai:inspirehep.net:18457612021 |
spellingShingle | Accelerators and Storage Rings Song, Honghai Ambrosio, Giorgio Amm, Kathleen Anerella, Michael Apollinari, Giorgio Cheng, Daniel Chlachidze, Guram DiMarco, Joseph Feher, Sandor Ferracin, Paolo Izquierdo Bermudez, Susana Jain, Animesh Joshi, Piyush Muratore, Joseph Pan, Heng Sabbi, GianLuca Schmalzle, Jesse Todesco, Ezio Wanderer, Peter Wang, Xiaorong Yu, Miao Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project |
title | Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project |
title_full | Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project |
title_fullStr | Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project |
title_full_unstemmed | Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project |
title_short | Magnetic Field Measurements of First Pre-series Full-Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi-Lumi LHC Project |
title_sort | magnetic field measurements of first pre-series full-length 4.2 m quadrupole mqxfa03 using pcb rotating coils for the hi-lumi lhc project |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2021.3053510 http://cds.cern.ch/record/2759166 |
work_keys_str_mv | AT songhonghai magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT ambrosiogiorgio magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT ammkathleen magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT anerellamichael magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT apollinarigiorgio magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT chengdaniel magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT chlachidzeguram magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT dimarcojoseph magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT fehersandor magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT ferracinpaolo magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT izquierdobermudezsusana magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT jainanimesh magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT joshipiyush magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT muratorejoseph magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT panheng magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT sabbigianluca magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT schmalzlejesse magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT todescoezio magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT wandererpeter magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT wangxiaorong magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject AT yumiao magneticfieldmeasurementsoffirstpreseriesfulllength42mquadrupolemqxfa03usingpcbrotatingcoilsforthehilumilhcproject |