Cargando…
Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
The second prototype of the MCBXFB nested orbit corrector for the upgrade of the LHC has been manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. This paper describes the changes introduced with respect to the first prototype in order to test some design improvement...
Autores principales: | , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2021.3059610 http://cds.cern.ch/record/2770764 |
_version_ | 1780971401330556928 |
---|---|
author | García-Matos, Jesús A Calero, Jesús Domínguez, Manuel Fernández, Alejandro Gómez, Pablo García-Tabarés, Luis Martínez, Teresa Jardim, Carla Martins Munilla, Javier Pardo, Jose A Pérez, Jose M Sobrino, Pablo Toral, Fernando Bajko, Marta Bourcey, Nicolas Ferradas, Salvador Fiscarelli, Lucio Guinchard, Michael Perez, Juan C Todesco, Ezio Willering, Gerard |
author_facet | García-Matos, Jesús A Calero, Jesús Domínguez, Manuel Fernández, Alejandro Gómez, Pablo García-Tabarés, Luis Martínez, Teresa Jardim, Carla Martins Munilla, Javier Pardo, Jose A Pérez, Jose M Sobrino, Pablo Toral, Fernando Bajko, Marta Bourcey, Nicolas Ferradas, Salvador Fiscarelli, Lucio Guinchard, Michael Perez, Juan C Todesco, Ezio Willering, Gerard |
author_sort | García-Matos, Jesús A |
collection | CERN |
description | The second prototype of the MCBXFB nested orbit corrector for the upgrade of the LHC has been manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. This paper describes the changes introduced with respect to the first prototype in order to test some design improvements intended for the series magnets. The preload of the coils has been carefully studied, aiming to improve the performance in combined operation. A power test campaign has been carried out for this second prototype at CERN. Both dipoles reached ultimate current without any quench when individually powered. However, the results in combined operation did not improve those of the first prototype. Further analysis and studies are ongoing. |
id | oai-inspirehep.net-1860674 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | oai-inspirehep.net-18606742021-05-31T15:16:35Zdoi:10.1109/TASC.2021.3059610http://cds.cern.ch/record/2770764engGarcía-Matos, Jesús ACalero, JesúsDomínguez, ManuelFernández, AlejandroGómez, PabloGarcía-Tabarés, LuisMartínez, TeresaJardim, Carla MartinsMunilla, JavierPardo, Jose APérez, Jose MSobrino, PabloToral, FernandoBajko, MartaBourcey, NicolasFerradas, SalvadorFiscarelli, LucioGuinchard, MichaelPerez, Juan CTodesco, EzioWillering, GerardFabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHCAccelerators and Storage RingsThe second prototype of the MCBXFB nested orbit corrector for the upgrade of the LHC has been manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. This paper describes the changes introduced with respect to the first prototype in order to test some design improvements intended for the series magnets. The preload of the coils has been carefully studied, aiming to improve the performance in combined operation. A power test campaign has been carried out for this second prototype at CERN. Both dipoles reached ultimate current without any quench when individually powered. However, the results in combined operation did not improve those of the first prototype. Further analysis and studies are ongoing.oai:inspirehep.net:18606742021 |
spellingShingle | Accelerators and Storage Rings García-Matos, Jesús A Calero, Jesús Domínguez, Manuel Fernández, Alejandro Gómez, Pablo García-Tabarés, Luis Martínez, Teresa Jardim, Carla Martins Munilla, Javier Pardo, Jose A Pérez, Jose M Sobrino, Pablo Toral, Fernando Bajko, Marta Bourcey, Nicolas Ferradas, Salvador Fiscarelli, Lucio Guinchard, Michael Perez, Juan C Todesco, Ezio Willering, Gerard Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC |
title | Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC |
title_full | Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC |
title_fullStr | Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC |
title_full_unstemmed | Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC |
title_short | Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC |
title_sort | fabrication and power test of the second mcbxfb nested orbit corrector prototype for hl-lhc |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2021.3059610 http://cds.cern.ch/record/2770764 |
work_keys_str_mv | AT garciamatosjesusa fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT calerojesus fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT dominguezmanuel fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT fernandezalejandro fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT gomezpablo fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT garciatabaresluis fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT martinezteresa fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT jardimcarlamartins fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT munillajavier fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT pardojosea fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT perezjosem fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT sobrinopablo fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT toralfernando fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT bajkomarta fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT bourceynicolas fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT ferradassalvador fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT fiscarellilucio fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT guinchardmichael fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT perezjuanc fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT todescoezio fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc AT willeringgerard fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc |