Cargando…

Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC

The second prototype of the MCBXFB nested orbit corrector for the upgrade of the LHC has been manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. This paper describes the changes introduced with respect to the first prototype in order to test some design improvement...

Descripción completa

Detalles Bibliográficos
Autores principales: García-Matos, Jesús A, Calero, Jesús, Domínguez, Manuel, Fernández, Alejandro, Gómez, Pablo, García-Tabarés, Luis, Martínez, Teresa, Jardim, Carla Martins, Munilla, Javier, Pardo, Jose A, Pérez, Jose M, Sobrino, Pablo, Toral, Fernando, Bajko, Marta, Bourcey, Nicolas, Ferradas, Salvador, Fiscarelli, Lucio, Guinchard, Michael, Perez, Juan C, Todesco, Ezio, Willering, Gerard
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2021.3059610
http://cds.cern.ch/record/2770764
_version_ 1780971401330556928
author García-Matos, Jesús A
Calero, Jesús
Domínguez, Manuel
Fernández, Alejandro
Gómez, Pablo
García-Tabarés, Luis
Martínez, Teresa
Jardim, Carla Martins
Munilla, Javier
Pardo, Jose A
Pérez, Jose M
Sobrino, Pablo
Toral, Fernando
Bajko, Marta
Bourcey, Nicolas
Ferradas, Salvador
Fiscarelli, Lucio
Guinchard, Michael
Perez, Juan C
Todesco, Ezio
Willering, Gerard
author_facet García-Matos, Jesús A
Calero, Jesús
Domínguez, Manuel
Fernández, Alejandro
Gómez, Pablo
García-Tabarés, Luis
Martínez, Teresa
Jardim, Carla Martins
Munilla, Javier
Pardo, Jose A
Pérez, Jose M
Sobrino, Pablo
Toral, Fernando
Bajko, Marta
Bourcey, Nicolas
Ferradas, Salvador
Fiscarelli, Lucio
Guinchard, Michael
Perez, Juan C
Todesco, Ezio
Willering, Gerard
author_sort García-Matos, Jesús A
collection CERN
description The second prototype of the MCBXFB nested orbit corrector for the upgrade of the LHC has been manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. This paper describes the changes introduced with respect to the first prototype in order to test some design improvements intended for the series magnets. The preload of the coils has been carefully studied, aiming to improve the performance in combined operation. A power test campaign has been carried out for this second prototype at CERN. Both dipoles reached ultimate current without any quench when individually powered. However, the results in combined operation did not improve those of the first prototype. Further analysis and studies are ongoing.
id oai-inspirehep.net-1860674
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling oai-inspirehep.net-18606742021-05-31T15:16:35Zdoi:10.1109/TASC.2021.3059610http://cds.cern.ch/record/2770764engGarcía-Matos, Jesús ACalero, JesúsDomínguez, ManuelFernández, AlejandroGómez, PabloGarcía-Tabarés, LuisMartínez, TeresaJardim, Carla MartinsMunilla, JavierPardo, Jose APérez, Jose MSobrino, PabloToral, FernandoBajko, MartaBourcey, NicolasFerradas, SalvadorFiscarelli, LucioGuinchard, MichaelPerez, Juan CTodesco, EzioWillering, GerardFabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHCAccelerators and Storage RingsThe second prototype of the MCBXFB nested orbit corrector for the upgrade of the LHC has been manufactured at CIEMAT and assembled at CERN, in the framework of the HL-LHC project. This paper describes the changes introduced with respect to the first prototype in order to test some design improvements intended for the series magnets. The preload of the coils has been carefully studied, aiming to improve the performance in combined operation. A power test campaign has been carried out for this second prototype at CERN. Both dipoles reached ultimate current without any quench when individually powered. However, the results in combined operation did not improve those of the first prototype. Further analysis and studies are ongoing.oai:inspirehep.net:18606742021
spellingShingle Accelerators and Storage Rings
García-Matos, Jesús A
Calero, Jesús
Domínguez, Manuel
Fernández, Alejandro
Gómez, Pablo
García-Tabarés, Luis
Martínez, Teresa
Jardim, Carla Martins
Munilla, Javier
Pardo, Jose A
Pérez, Jose M
Sobrino, Pablo
Toral, Fernando
Bajko, Marta
Bourcey, Nicolas
Ferradas, Salvador
Fiscarelli, Lucio
Guinchard, Michael
Perez, Juan C
Todesco, Ezio
Willering, Gerard
Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
title Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
title_full Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
title_fullStr Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
title_full_unstemmed Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
title_short Fabrication and Power Test of the Second MCBXFB Nested Orbit Corrector Prototype for HL-LHC
title_sort fabrication and power test of the second mcbxfb nested orbit corrector prototype for hl-lhc
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2021.3059610
http://cds.cern.ch/record/2770764
work_keys_str_mv AT garciamatosjesusa fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT calerojesus fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT dominguezmanuel fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT fernandezalejandro fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT gomezpablo fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT garciatabaresluis fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT martinezteresa fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT jardimcarlamartins fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT munillajavier fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT pardojosea fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT perezjosem fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT sobrinopablo fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT toralfernando fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT bajkomarta fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT bourceynicolas fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT ferradassalvador fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT fiscarellilucio fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT guinchardmichael fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT perezjuanc fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT todescoezio fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc
AT willeringgerard fabricationandpowertestofthesecondmcbxfbnestedorbitcorrectorprototypeforhllhc