Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN’s Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cry...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/tasc.2021.3065978 http://cds.cern.ch/record/2773277 |
_version_ | 1780971520045088768 |
---|---|
author | Ludwin, Jaromir Bednarek, Mateusz Bednarski, Mikolaj Bielewski, Jaroslaw Bogdali, Pawel D'Angelo, Giorgio Daniluk, Witold Dutkiewicz, Erazm Maria Grzadziel, Dominik Janik, Grzegorz Jurkiewicz, Piotr Kantor, Wieslaw Kotarba, Andrzej Krempa, Artur Lasko, Pawel Ostrowicz, Waclaw Proszkowiec, Andrzej Rodriguez Mateos, Felix Siemko, Andrzej Szeliga, Magda Witkowski, Karol Wojas, Damian |
author_facet | Ludwin, Jaromir Bednarek, Mateusz Bednarski, Mikolaj Bielewski, Jaroslaw Bogdali, Pawel D'Angelo, Giorgio Daniluk, Witold Dutkiewicz, Erazm Maria Grzadziel, Dominik Janik, Grzegorz Jurkiewicz, Piotr Kantor, Wieslaw Kotarba, Andrzej Krempa, Artur Lasko, Pawel Ostrowicz, Waclaw Proszkowiec, Andrzej Rodriguez Mateos, Felix Siemko, Andrzej Szeliga, Magda Witkowski, Karol Wojas, Damian |
author_sort | Ludwin, Jaromir |
collection | CERN |
description | The electrical quality assurance (ELQA) of the superconducting circuits of CERN’s Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed. |
id | oai-inspirehep.net-1868246 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | oai-inspirehep.net-18682462021-06-18T18:55:39Zdoi:10.1109/tasc.2021.3065978http://cds.cern.ch/record/2773277engLudwin, JaromirBednarek, MateuszBednarski, MikolajBielewski, JaroslawBogdali, PawelD'Angelo, GiorgioDaniluk, WitoldDutkiewicz, Erazm MariaGrzadziel, DominikJanik, GrzegorzJurkiewicz, PiotrKantor, WieslawKotarba, AndrzejKrempa, ArturLasko, PawelOstrowicz, WaclawProszkowiec, AndrzejRodriguez Mateos, FelixSiemko, AndrzejSzeliga, MagdaWitkowski, KarolWojas, DamianPreparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long ShutdownAccelerators and Storage RingsThe electrical quality assurance (ELQA) of the superconducting circuits of CERN’s Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.oai:inspirehep.net:18682462021 |
spellingShingle | Accelerators and Storage Rings Ludwin, Jaromir Bednarek, Mateusz Bednarski, Mikolaj Bielewski, Jaroslaw Bogdali, Pawel D'Angelo, Giorgio Daniluk, Witold Dutkiewicz, Erazm Maria Grzadziel, Dominik Janik, Grzegorz Jurkiewicz, Piotr Kantor, Wieslaw Kotarba, Andrzej Krempa, Artur Lasko, Pawel Ostrowicz, Waclaw Proszkowiec, Andrzej Rodriguez Mateos, Felix Siemko, Andrzej Szeliga, Magda Witkowski, Karol Wojas, Damian Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown |
title | Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown |
title_full | Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown |
title_fullStr | Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown |
title_full_unstemmed | Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown |
title_short | Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown |
title_sort | preparation and execution of the electrical quality assurance program on the lhc superconducting circuits during the second long shutdown |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/tasc.2021.3065978 http://cds.cern.ch/record/2773277 |
work_keys_str_mv | AT ludwinjaromir preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT bednarekmateusz preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT bednarskimikolaj preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT bielewskijaroslaw preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT bogdalipawel preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT dangelogiorgio preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT danilukwitold preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT dutkiewiczerazmmaria preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT grzadzieldominik preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT janikgrzegorz preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT jurkiewiczpiotr preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT kantorwieslaw preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT kotarbaandrzej preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT krempaartur preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT laskopawel preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT ostrowiczwaclaw preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT proszkowiecandrzej preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT rodriguezmateosfelix preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT siemkoandrzej preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT szeligamagda preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT witkowskikarol preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown AT wojasdamian preparationandexecutionoftheelectricalqualityassuranceprogramonthelhcsuperconductingcircuitsduringthesecondlongshutdown |