Cargando…
Test Results of the First 3.7 m long Nb$_3$Sn Quadrupole by LARP and Future Plans
In December 2009 during its first cold test, LQS01, the first Long Nb$_3$Sn Quadrupole made by LARP (LHC Accelerator Research Program, a collaboration of BNL, FNAL, LBNL and SLAC), reached its target field gradient of 200 T/m. This target was set in 2005 by the US Department of Energy, CERN and LARP...
Autores principales: | Ambrosio, G, Andreev, N, Anerella, M, Barzi, E, Bingham, B, Bocian, D, Bossert, R, Caspi, S, Chlachidize, G, Dietderich, D, Escallier, J, Felice, H, Ferracin, P, Ghosh, A, Godeke, A, Hafalia, R, Hannaford, R, Jochen, G, Kashikhin, V V, Kim, M J, Kovach, P, Lamm, M, McInturff, A, Muratore, J, Nobrega, F, Novitsky, I, Orris, D, Prebys, E, Prestemon, S, Sabbi, G L, Schmalzle, J, Sylvester, C, Tartaglia, M, Turrioni, D, Velev, G, Wanderer, P, Whitson, G, Zlobin, A V |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2010.2089586 http://cds.cern.ch/record/2773926 |
Ejemplares similares
-
Final Development and test preparation of the first 3.7m long Nb$_{3}$Sn quadrupole by LARP
por: Ambrosio, G, et al.
Publicado: (2010) -
Progress in the long $Nb_3Sn$ quadrupole R&D by LARP
por: Ambrosio, G, et al.
Publicado: (2012) -
Development and Coil Fabrication for the LARP 3.7-m Long Nb3Sn Quadrupole
por: Ambrosio, Giorgio, et al.
Publicado: (2009) -
Magnet R&D for the US LHC Accelerator Research Program (LARP)
por: Gourlay, S A, et al.
Publicado: (2006) -
Construction and Test of 3.6 m Nb$_3$Sn Racetrack Coils for LARP
por: Wanderer, P, et al.
Publicado: (2008)