Cargando…

H(2)-rich syngas production from gasification involving kinetic modeling: RSM-utility optimization and techno-economic analysis

In this research article, H(2) rich syngas production is optimized using response surface methodology (RSM) and a utility concept involving chemical kinetic modeling considering eucalyptus wood sawdust (CH(1.63)O(1.02)) as gasification feedstock. By adding water gas shift reaction, the modified kine...

Descripción completa

Detalles Bibliográficos
Autores principales: Sharma, Ajay, Nath, Ratnadeep
Formato: Online Artículo Texto
Lenguaje:English
Publicado: The Royal Society of Chemistry 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10065057/
https://www.ncbi.nlm.nih.gov/pubmed/37006364
http://dx.doi.org/10.1039/d3ra00287j
Descripción
Sumario:In this research article, H(2) rich syngas production is optimized using response surface methodology (RSM) and a utility concept involving chemical kinetic modeling considering eucalyptus wood sawdust (CH(1.63)O(1.02)) as gasification feedstock. By adding water gas shift reaction, the modified kinetic model is validated with lab scale experimental data (2.56 ≤ root mean square error ≤ 3.67). Four operating parameters (i.e., particle size “d(p)”, temperature “T”, steam to biomass ratio “SBR”, and equivalence ratio “ER”) of air–steam gasifier at three levels are used to frame the test cases. Single objective functions like H(2) maximization and CO(2) minimization are considered whereas for multi-objective function a utility parameter (80% H(2) : 20% CO(2)) is considered. The regression coefficients (R(H(2))(2) = 0.89, R(CO(2))(2) = 0.98 and R(U)(2) = 0.90) obtained during the analysis of variance (ANOVA) confirm a close fitting of the quadratic model with the chemical kinetic model. ANOVA results indicate ER as the most influential parameter followed by T, SBR, and d(p). RSM optimization gives H(2)|(max) = 51.75 vol%, CO(2)|(min) = 14.65 vol% and utility gives H(2)|(opt.) = 51.69 vol% (0.11%↓), CO(2)|(opt.) = 14.70 vol% (0.34%↑). The techno-economic analysis for a 200 m(3) per day syngas production plant (at industrial scale) assured a payback period of 4.8 (∼5) years with a minimum profit margin of 142% when syngas selling price is set as 43 INR (0.52 USD) per kg.