Cargando…
Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums
BACKGROUND: In the course of building extension works at Dresden University Hospital, it was necessary to shut down the central medical gas supply in a building with 3 intensive care wards with 22 beds, an operating theater tract with 5 operating rooms and 6 normal wards each with 28 beds during ong...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer Medizin
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10076373/ https://www.ncbi.nlm.nih.gov/pubmed/36754868 http://dx.doi.org/10.1007/s00101-023-01254-8 |
_version_ | 1785020116563394560 |
---|---|
author | Heller, Axel R. Eberlein-Gonska, Maria Held, Hanns C. Koch, Thea |
author_facet | Heller, Axel R. Eberlein-Gonska, Maria Held, Hanns C. Koch, Thea |
author_sort | Heller, Axel R. |
collection | PubMed |
description | BACKGROUND: In the course of building extension works at Dresden University Hospital, it was necessary to shut down the central medical gas supply in a building with 3 intensive care wards with 22 beds, an operating theater tract with 5 operating rooms and 6 normal wards each with 28 beds during ongoing services. Thus, for the construction phase there was a need to establish an interim decentralized gas supply with zero failure tolerance for the affected functional units . METHODS: Following established procedures for possible risk and failure analysis, a project group was set up by the hospital’s emergency and disaster management officer to develop a project plan, a needs assessment and a communication plan. RESULTS: A variety of risk factors were systematically identified for which appropriate countermeasures needed to be designed. The needs assessment over 4 h based on physiological parameters for the maximum available 22 ventilator beds resulted in 26,000 l of oxygen and 26,000 l of compressed air. A total of 7 supply points were each equipped with two 50l cylinders for both oxygen and compressed air, with a total availability of 175,000 l of each of the 2 gases. Another eight cylinders each were held in reserve. The project was carried out on a Saturday without an elective surgery program, so that the operating rooms concerned could be closed. The timing was chosen so that double staffing of intensive care personnel was available during the afternoon shift change. In advance, as many of the patients on mechanical ventilation as possible were transferred within the hospital; however, nine of the mechanically ventilated patients had to remain. The technical intervention in the gas supply lasted only 2 h without affecting the patient’s condition. During the 2‑h interim supply, 16,500 l of compressed air and 8000 l of oxygen were consumed on the high-care wards. The calculated hourly consumption per ventilated patient was 917 l of air (15 l/min) and 444 l of oxygen (7 l/min). The quantity framework based on empirical values from intensive care medicine was significantly lower. This was more than compensated for by the 10-fold stocking of gas and the predictably lower number of ventilated patients than the maximum occupancy used as a basis. CONCLUSION: For technical interventions in high-risk areas, careful planning and execution in an effective team is required. Established procedures of project management and risk assessment help to avoid errors. |
format | Online Article Text |
id | pubmed-10076373 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Springer Medizin |
record_format | MEDLINE/PubMed |
spelling | pubmed-100763732023-04-07 Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums Heller, Axel R. Eberlein-Gonska, Maria Held, Hanns C. Koch, Thea Anaesthesiologie Patientensicherheit BACKGROUND: In the course of building extension works at Dresden University Hospital, it was necessary to shut down the central medical gas supply in a building with 3 intensive care wards with 22 beds, an operating theater tract with 5 operating rooms and 6 normal wards each with 28 beds during ongoing services. Thus, for the construction phase there was a need to establish an interim decentralized gas supply with zero failure tolerance for the affected functional units . METHODS: Following established procedures for possible risk and failure analysis, a project group was set up by the hospital’s emergency and disaster management officer to develop a project plan, a needs assessment and a communication plan. RESULTS: A variety of risk factors were systematically identified for which appropriate countermeasures needed to be designed. The needs assessment over 4 h based on physiological parameters for the maximum available 22 ventilator beds resulted in 26,000 l of oxygen and 26,000 l of compressed air. A total of 7 supply points were each equipped with two 50l cylinders for both oxygen and compressed air, with a total availability of 175,000 l of each of the 2 gases. Another eight cylinders each were held in reserve. The project was carried out on a Saturday without an elective surgery program, so that the operating rooms concerned could be closed. The timing was chosen so that double staffing of intensive care personnel was available during the afternoon shift change. In advance, as many of the patients on mechanical ventilation as possible were transferred within the hospital; however, nine of the mechanically ventilated patients had to remain. The technical intervention in the gas supply lasted only 2 h without affecting the patient’s condition. During the 2‑h interim supply, 16,500 l of compressed air and 8000 l of oxygen were consumed on the high-care wards. The calculated hourly consumption per ventilated patient was 917 l of air (15 l/min) and 444 l of oxygen (7 l/min). The quantity framework based on empirical values from intensive care medicine was significantly lower. This was more than compensated for by the 10-fold stocking of gas and the predictably lower number of ventilated patients than the maximum occupancy used as a basis. CONCLUSION: For technical interventions in high-risk areas, careful planning and execution in an effective team is required. Established procedures of project management and risk assessment help to avoid errors. Springer Medizin 2023-02-08 2023 /pmc/articles/PMC10076373/ /pubmed/36754868 http://dx.doi.org/10.1007/s00101-023-01254-8 Text en © The Author(s) 2023 https://creativecommons.org/licenses/by/4.0/Open Access Dieser Artikel wird unter der Creative Commons Namensnennung 4.0 International Lizenz veröffentlicht, welche die Nutzung, Vervielfältigung, Bearbeitung, Verbreitung und Wiedergabe in jeglichem Medium und Format erlaubt, sofern Sie den/die ursprünglichen Autor(en) und die Quelle ordnungsgemäß nennen, einen Link zur Creative Commons Lizenz beifügen und angeben, ob Änderungen vorgenommen wurden. Die in diesem Artikel enthaltenen Bilder und sonstiges Drittmaterial unterliegen ebenfalls der genannten Creative Commons Lizenz, sofern sich aus der Abbildungslegende nichts anderes ergibt. Sofern das betreffende Material nicht unter der genannten Creative Commons Lizenz steht und die betreffende Handlung nicht nach gesetzlichen Vorschriften erlaubt ist, ist für die oben aufgeführten Weiterverwendungen des Materials die Einwilligung des jeweiligen Rechteinhabers einzuholen. Weitere Details zur Lizenz entnehmen Sie bitte der Lizenzinformation auf http://creativecommons.org/licenses/by/4.0/deed.de (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Patientensicherheit Heller, Axel R. Eberlein-Gonska, Maria Held, Hanns C. Koch, Thea Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums |
title | Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums |
title_full | Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums |
title_fullStr | Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums |
title_full_unstemmed | Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums |
title_short | Systematisches Risikomanagement für eine geplante Gasabschaltung im High-Care-Bereich eines Universitätsklinikums |
title_sort | systematisches risikomanagement für eine geplante gasabschaltung im high-care-bereich eines universitätsklinikums |
topic | Patientensicherheit |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10076373/ https://www.ncbi.nlm.nih.gov/pubmed/36754868 http://dx.doi.org/10.1007/s00101-023-01254-8 |
work_keys_str_mv | AT helleraxelr systematischesrisikomanagementfureinegeplantegasabschaltungimhighcarebereicheinesuniversitatsklinikums AT eberleingonskamaria systematischesrisikomanagementfureinegeplantegasabschaltungimhighcarebereicheinesuniversitatsklinikums AT heldhannsc systematischesrisikomanagementfureinegeplantegasabschaltungimhighcarebereicheinesuniversitatsklinikums AT kochthea systematischesrisikomanagementfureinegeplantegasabschaltungimhighcarebereicheinesuniversitatsklinikums |