Cargando…

Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum

The Pile-beam-arch (PBA) method is a new and effective construction method for the urban metro station. It is the key to ensuring the safe construction of the station to clarify the influence of PBA method construction on surface deformation under unfavorable geological and large span conditions. Ba...

Descripción completa

Detalles Bibliográficos
Autores principales: Li, Tao, Li, Yue, Yang, Tengyu, Hou, Rui, Gao, Yuan, Liu, Bo, Qiao, Guogang
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10096090/
https://www.ncbi.nlm.nih.gov/pubmed/37049228
http://dx.doi.org/10.3390/ma16072934
_version_ 1785024239395405824
author Li, Tao
Li, Yue
Yang, Tengyu
Hou, Rui
Gao, Yuan
Liu, Bo
Qiao, Guogang
author_facet Li, Tao
Li, Yue
Yang, Tengyu
Hou, Rui
Gao, Yuan
Liu, Bo
Qiao, Guogang
author_sort Li, Tao
collection PubMed
description The Pile-beam-arch (PBA) method is a new and effective construction method for the urban metro station. It is the key to ensuring the safe construction of the station to clarify the influence of PBA method construction on surface deformation under unfavorable geological and large span conditions. Based on a station of Beijing subway, this paper studies the surface deformation law of the large-span PBA method in different construction stages under silty clay–pebble composite stratum by means of FLAC 3D numerical analysis and field monitoring of level. Then the influence of the excavation scheme of the pilot tunnel and the construction scheme of the secondary lining of the arch on the surface deformation is simulated and analyzed. The results show that, through numerical simulation, the ratio of pilot tunnel excavation: pile-beam construction: vault initial support construction: vault secondary lining construction is about 5:1.1:3.3:0.6. The settlement deformation mainly occurs in the excavation stage of the pilot tunnel. Through the comparative analysis of the field monitoring results and the numerical simulation results, it can be seen that the two results are highly consistent, which verifies the accuracy of the numerical simulation results. The pilot tunnel excavation scheme of excavating the middle first and then excavating both sides, first through the upper layer and then through the lower layer, and the scheme of one-time construction of the secondary lining of the arch are better. The research results promote the further maturity and perfection of large-span PBA method construction under unfavorable geology and provide reference for similar projects.
format Online
Article
Text
id pubmed-10096090
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-100960902023-04-13 Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum Li, Tao Li, Yue Yang, Tengyu Hou, Rui Gao, Yuan Liu, Bo Qiao, Guogang Materials (Basel) Article The Pile-beam-arch (PBA) method is a new and effective construction method for the urban metro station. It is the key to ensuring the safe construction of the station to clarify the influence of PBA method construction on surface deformation under unfavorable geological and large span conditions. Based on a station of Beijing subway, this paper studies the surface deformation law of the large-span PBA method in different construction stages under silty clay–pebble composite stratum by means of FLAC 3D numerical analysis and field monitoring of level. Then the influence of the excavation scheme of the pilot tunnel and the construction scheme of the secondary lining of the arch on the surface deformation is simulated and analyzed. The results show that, through numerical simulation, the ratio of pilot tunnel excavation: pile-beam construction: vault initial support construction: vault secondary lining construction is about 5:1.1:3.3:0.6. The settlement deformation mainly occurs in the excavation stage of the pilot tunnel. Through the comparative analysis of the field monitoring results and the numerical simulation results, it can be seen that the two results are highly consistent, which verifies the accuracy of the numerical simulation results. The pilot tunnel excavation scheme of excavating the middle first and then excavating both sides, first through the upper layer and then through the lower layer, and the scheme of one-time construction of the secondary lining of the arch are better. The research results promote the further maturity and perfection of large-span PBA method construction under unfavorable geology and provide reference for similar projects. MDPI 2023-04-06 /pmc/articles/PMC10096090/ /pubmed/37049228 http://dx.doi.org/10.3390/ma16072934 Text en © 2023 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Li, Tao
Li, Yue
Yang, Tengyu
Hou, Rui
Gao, Yuan
Liu, Bo
Qiao, Guogang
Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum
title Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum
title_full Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum
title_fullStr Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum
title_full_unstemmed Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum
title_short Influence of the Large-Span Pile-Beam-Arch Construction Method on the Surface Deformation of a Metro Station in the Silty Clay–Pebble Composite Stratum
title_sort influence of the large-span pile-beam-arch construction method on the surface deformation of a metro station in the silty clay–pebble composite stratum
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10096090/
https://www.ncbi.nlm.nih.gov/pubmed/37049228
http://dx.doi.org/10.3390/ma16072934
work_keys_str_mv AT litao influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum
AT liyue influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum
AT yangtengyu influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum
AT hourui influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum
AT gaoyuan influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum
AT liubo influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum
AT qiaoguogang influenceofthelargespanpilebeamarchconstructionmethodonthesurfacedeformationofametrostationinthesiltyclaypebblecompositestratum