Simulation and optimization of scrap wagon dismantling system based on Plant Simulation

Based on the existing plant layout and process flow, a simulation analysis was conducted using the Plant Simulation platform with the utilization efficiency of each station and production capacity of the dismantling system as indicators. A problem with long-term suspension in the disassembly process...

Descripción completa

Detalles Bibliográficos
Autores principales: Chen, Hai-Qing, Dong, Yu-De, Hu, Fei, Liu, Ming-Ming, Zhang, Shi-Bao
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Springer Nature Singapore 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10126191/
https://www.ncbi.nlm.nih.gov/pubmed/37093402
http://dx.doi.org/10.1186/s42492-023-00134-7
Descripción
Sumario:Based on the existing plant layout and process flow, a simulation analysis was conducted using the Plant Simulation platform with the utilization efficiency of each station and production capacity of the dismantling system as indicators. A problem with long-term suspension in the disassembly process was determined. Based on the two optimization directions of increasing material transportation equipment and expanding the buffer capacity, a cost-oriented optimization model is established. A genetic algorithm and model simulation were used to solve the model. An optimization scheme that satisfies the production needs and has the lowest cost is proposed. The results show that the optimized dismantling system solves the suspended work problem at the dismantling station and a significant improvement in productivity and station utilization efficiency compared with the previous system.