Cargando…
Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines
Over the recent years, due to the increase in the population covered by local wastewater treatment plants (WWTP), upgrading the existing treatment plants needs special attention more than ever. One of the suggested solutions removal the existing sludge treatment units in local WWTP and transfer the...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10148116/ https://www.ncbi.nlm.nih.gov/pubmed/37128311 http://dx.doi.org/10.1016/j.heliyon.2023.e15574 |
_version_ | 1785034929863655424 |
---|---|
author | Ghorbanpour, Sohila Farzadkia, Mahdi Kermani, Majid Kalantary, Roshanak Rezaei Pasalari, Hasan |
author_facet | Ghorbanpour, Sohila Farzadkia, Mahdi Kermani, Majid Kalantary, Roshanak Rezaei Pasalari, Hasan |
author_sort | Ghorbanpour, Sohila |
collection | PubMed |
description | Over the recent years, due to the increase in the population covered by local wastewater treatment plants (WWTP), upgrading the existing treatment plants needs special attention more than ever. One of the suggested solutions removal the existing sludge treatment units in local WWTP and transfer the sludge to a centralized WWTP. The present study was developed to investigate the hydraulic feasibility of sludge transfer from Shahrak-e-GharbWWTP as a local treatment plant to South Tehran sewage treatment plant in Tehran. To this end, at first, a map containing descriptive information and hydraulic characteristics related to the sewage transmission network between local and centralized WWTP was collected from the sewage company. This information was used to calculate the maximum capacity, current flow and draw the hydraulic profile of the sewage transmission line. Then, the transmission line profile was drawn using Manning's hydraulic model and SewerCAD v10.01 software. According to the obtained results, areas 1 and 3 with sewage line diameters of 1000 and 1400 mm did not have any special problem in terms of entering the sludge. Hydraulic analyzes showed that some lines in areas 2, 4, 5, and 6 suffered setbacks and crises after the increase of sludge, which require auxiliary lines. The results indicated that more than 85% of the sewage network lines have the ability to transfer the excess sludge of the local treatment plant, however, in 36 lines, mostly located in zones 2 and 6, with a diameter of 1200 and 2000 mm, there is a crisis of sewage filling and backflow. Therefore, in order to reduce hydraulic stresses in these lines, it was suggested to build an auxiliary line (bypass ring at the beginning and end of these lines). |
format | Online Article Text |
id | pubmed-10148116 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-101481162023-04-30 Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines Ghorbanpour, Sohila Farzadkia, Mahdi Kermani, Majid Kalantary, Roshanak Rezaei Pasalari, Hasan Heliyon Research Article Over the recent years, due to the increase in the population covered by local wastewater treatment plants (WWTP), upgrading the existing treatment plants needs special attention more than ever. One of the suggested solutions removal the existing sludge treatment units in local WWTP and transfer the sludge to a centralized WWTP. The present study was developed to investigate the hydraulic feasibility of sludge transfer from Shahrak-e-GharbWWTP as a local treatment plant to South Tehran sewage treatment plant in Tehran. To this end, at first, a map containing descriptive information and hydraulic characteristics related to the sewage transmission network between local and centralized WWTP was collected from the sewage company. This information was used to calculate the maximum capacity, current flow and draw the hydraulic profile of the sewage transmission line. Then, the transmission line profile was drawn using Manning's hydraulic model and SewerCAD v10.01 software. According to the obtained results, areas 1 and 3 with sewage line diameters of 1000 and 1400 mm did not have any special problem in terms of entering the sludge. Hydraulic analyzes showed that some lines in areas 2, 4, 5, and 6 suffered setbacks and crises after the increase of sludge, which require auxiliary lines. The results indicated that more than 85% of the sewage network lines have the ability to transfer the excess sludge of the local treatment plant, however, in 36 lines, mostly located in zones 2 and 6, with a diameter of 1200 and 2000 mm, there is a crisis of sewage filling and backflow. Therefore, in order to reduce hydraulic stresses in these lines, it was suggested to build an auxiliary line (bypass ring at the beginning and end of these lines). Elsevier 2023-04-18 /pmc/articles/PMC10148116/ /pubmed/37128311 http://dx.doi.org/10.1016/j.heliyon.2023.e15574 Text en © 2023 The Authors. Published by Elsevier Ltd. https://creativecommons.org/licenses/by-nc-nd/4.0/This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). |
spellingShingle | Research Article Ghorbanpour, Sohila Farzadkia, Mahdi Kermani, Majid Kalantary, Roshanak Rezaei Pasalari, Hasan Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines |
title | Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines |
title_full | Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines |
title_fullStr | Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines |
title_full_unstemmed | Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines |
title_short | Hydraulic feasibility of discharging sludge from a local WWTP to a centralized WWTP through sewage network lines |
title_sort | hydraulic feasibility of discharging sludge from a local wwtp to a centralized wwtp through sewage network lines |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10148116/ https://www.ncbi.nlm.nih.gov/pubmed/37128311 http://dx.doi.org/10.1016/j.heliyon.2023.e15574 |
work_keys_str_mv | AT ghorbanpoursohila hydraulicfeasibilityofdischargingsludgefromalocalwwtptoacentralizedwwtpthroughsewagenetworklines AT farzadkiamahdi hydraulicfeasibilityofdischargingsludgefromalocalwwtptoacentralizedwwtpthroughsewagenetworklines AT kermanimajid hydraulicfeasibilityofdischargingsludgefromalocalwwtptoacentralizedwwtpthroughsewagenetworklines AT kalantaryroshanakrezaei hydraulicfeasibilityofdischargingsludgefromalocalwwtptoacentralizedwwtpthroughsewagenetworklines AT pasalarihasan hydraulicfeasibilityofdischargingsludgefromalocalwwtptoacentralizedwwtpthroughsewagenetworklines |