Cargando…
Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application
This study investigates a project scheduling problem of prefabricated building (PB) construction in an uncertain environment. Different from the traditional scheduling models in PB construction, we consider a complex multi-stage cooperation system including the production, transportation and assembl...
Autores principales: | Wang, Jingjing, Liu, Huimin, Wang, Zongxi |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Korean Society of Civil Engineers
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10148573/ http://dx.doi.org/10.1007/s12205-023-2164-8 |
Ejemplares similares
-
A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows
por: Banihashemi, Sayyid Ali, et al.
Publicado: (2022) -
Construction time, cost and testing data of a prefabricated isolation medical unit for COVID-19
por: Zhou, Yu, et al.
Publicado: (2020) -
Development of Knowledge Graph Based on Risk Register to Support Risk Management of Construction Projects
por: Isah, Muritala Adebayo, et al.
Publicado: (2023) -
Project Coordinators’ Perceptions according to the Organization Structure to Reduce Communication Risks in Multinational Project
por: Lee, Kyung-Tae, et al.
Publicado: (2023) -
Blockchain-Based Automatic Tracking and Extracting Construction Document for Claim and Dispute Support
por: Kim, Eu Wang, et al.
Publicado: (2022)