Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions
All three pillars of sustainability must be met for a construction project to be considered sustainable. Although several studies have been carried out on sustainability in the construction industry under uncertain conditions, there has been a lack of a comprehensive model to assess all three pillar...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer US
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10149108/ https://www.ncbi.nlm.nih.gov/pubmed/37363064 http://dx.doi.org/10.1007/s10669-023-09913-2 |
_version_ | 1785035103083167744 |
---|---|
author | Anbari Moghadam, Mahdi Bagherpour, Morteza Ghannadpour, Seyed Farid |
author_facet | Anbari Moghadam, Mahdi Bagherpour, Morteza Ghannadpour, Seyed Farid |
author_sort | Anbari Moghadam, Mahdi |
collection | PubMed |
description | All three pillars of sustainability must be met for a construction project to be considered sustainable. Although several studies have been carried out on sustainability in the construction industry under uncertain conditions, there has been a lack of a comprehensive model to assess all three pillars of sustainability during the execution of a construction project with consideration of the uncertain and unreliable nature of the gathered data. In this article, a fuzzy inference system model was developed to fill this research gap. The Cost Performance Index from earned value management, an effective tool for cost control of projects, is used to assess the economic sustainability status during the project execution. Besides, from the expert opinions and literature review, sustainability-related attributes are gathered to identify the dimensions and enablers of a construction project. This research aimed not only to improve the previous social sustainability Indexes for construction projects by using Z-numbers but also to develop and introduce a comprehensive Z Construction Environmental Sustainability Index alongside the other two pillars. The previous hierarchal method to calculate the Fuzzy indexes is also improved to overcome possible complexity problems. Calculating the three pillars of sustainability and using them as inputs into the Mamdani FIS model to obtain the overall sustainability status, the proposed model, which is calculated with the Z-numbers, is compared with the results of conventional Fuzzy numbers and deterministic approach. The results of the comparison show that the proposed model is more rigorous and effective than the previous methods in the numerical case. |
format | Online Article Text |
id | pubmed-10149108 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Springer US |
record_format | MEDLINE/PubMed |
spelling | pubmed-101491082023-05-01 Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions Anbari Moghadam, Mahdi Bagherpour, Morteza Ghannadpour, Seyed Farid Environ Syst Decis Article All three pillars of sustainability must be met for a construction project to be considered sustainable. Although several studies have been carried out on sustainability in the construction industry under uncertain conditions, there has been a lack of a comprehensive model to assess all three pillars of sustainability during the execution of a construction project with consideration of the uncertain and unreliable nature of the gathered data. In this article, a fuzzy inference system model was developed to fill this research gap. The Cost Performance Index from earned value management, an effective tool for cost control of projects, is used to assess the economic sustainability status during the project execution. Besides, from the expert opinions and literature review, sustainability-related attributes are gathered to identify the dimensions and enablers of a construction project. This research aimed not only to improve the previous social sustainability Indexes for construction projects by using Z-numbers but also to develop and introduce a comprehensive Z Construction Environmental Sustainability Index alongside the other two pillars. The previous hierarchal method to calculate the Fuzzy indexes is also improved to overcome possible complexity problems. Calculating the three pillars of sustainability and using them as inputs into the Mamdani FIS model to obtain the overall sustainability status, the proposed model, which is calculated with the Z-numbers, is compared with the results of conventional Fuzzy numbers and deterministic approach. The results of the comparison show that the proposed model is more rigorous and effective than the previous methods in the numerical case. Springer US 2023-04-30 /pmc/articles/PMC10149108/ /pubmed/37363064 http://dx.doi.org/10.1007/s10669-023-09913-2 Text en © The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature 2023, Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law. This article is made available via the PMC Open Access Subset for unrestricted research re-use and secondary analysis in any form or by any means with acknowledgement of the original source. These permissions are granted for the duration of the World Health Organization (WHO) declaration of COVID-19 as a global pandemic. |
spellingShingle | Article Anbari Moghadam, Mahdi Bagherpour, Morteza Ghannadpour, Seyed Farid Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
title | Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
title_full | Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
title_fullStr | Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
title_full_unstemmed | Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
title_short | Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
title_sort | sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10149108/ https://www.ncbi.nlm.nih.gov/pubmed/37363064 http://dx.doi.org/10.1007/s10669-023-09913-2 |
work_keys_str_mv | AT anbarimoghadammahdi sustainabilityassessmentinconstructionprojectsasustainableearnedvaluemanagementmodelunderuncertainandunreliableconditions AT bagherpourmorteza sustainabilityassessmentinconstructionprojectsasustainableearnedvaluemanagementmodelunderuncertainandunreliableconditions AT ghannadpourseyedfarid sustainabilityassessmentinconstructionprojectsasustainableearnedvaluemanagementmodelunderuncertainandunreliableconditions |