Cargando…
Analysis of factors affecting the construction duration of public health emergency medical facilities
OBJECTIVES: This study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced. METHODS: Combining 30 relevant emergency medical facility construction cases in different cities in China from 2020 to 2021, sev...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Frontiers Media S.A.
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10192559/ https://www.ncbi.nlm.nih.gov/pubmed/37213653 http://dx.doi.org/10.3389/fpubh.2023.1162804 |
_version_ | 1785043648159678464 |
---|---|
author | Zhao, Wenchao He, Haibo |
author_facet | Zhao, Wenchao He, Haibo |
author_sort | Zhao, Wenchao |
collection | PubMed |
description | OBJECTIVES: This study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced. METHODS: Combining 30 relevant emergency medical facility construction cases in different cities in China from 2020 to 2021, seven condition variables and an outcome variable were selected, and necessary and sufficient condition analyses of duration influence factors were conducted using the fsQCA method. RESULTS: The consistency of seven condition variables was <0.9, which shows that the construction period of public health emergency medical facilities is not independently affected by a single condition variable but by multiple influencing factors. The solution consistency value of the path configurations was 0.905, indicating that four path configurations were sufficient for the outcome variables. The solution coverage of the four path configurations was 0.637, indicating that they covered ~63.7% of the public health emergency medical facility cases. CONCLUSION: To reduce the construction duration, the construction of emergency medical facilities should focus on planning and design, the selection of an appropriate form of construction, the reasonable deployment of resources, and the vigorous adoption of information technology. |
format | Online Article Text |
id | pubmed-10192559 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Frontiers Media S.A. |
record_format | MEDLINE/PubMed |
spelling | pubmed-101925592023-05-19 Analysis of factors affecting the construction duration of public health emergency medical facilities Zhao, Wenchao He, Haibo Front Public Health Public Health OBJECTIVES: This study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced. METHODS: Combining 30 relevant emergency medical facility construction cases in different cities in China from 2020 to 2021, seven condition variables and an outcome variable were selected, and necessary and sufficient condition analyses of duration influence factors were conducted using the fsQCA method. RESULTS: The consistency of seven condition variables was <0.9, which shows that the construction period of public health emergency medical facilities is not independently affected by a single condition variable but by multiple influencing factors. The solution consistency value of the path configurations was 0.905, indicating that four path configurations were sufficient for the outcome variables. The solution coverage of the four path configurations was 0.637, indicating that they covered ~63.7% of the public health emergency medical facility cases. CONCLUSION: To reduce the construction duration, the construction of emergency medical facilities should focus on planning and design, the selection of an appropriate form of construction, the reasonable deployment of resources, and the vigorous adoption of information technology. Frontiers Media S.A. 2023-05-04 /pmc/articles/PMC10192559/ /pubmed/37213653 http://dx.doi.org/10.3389/fpubh.2023.1162804 Text en Copyright © 2023 Zhao and He. https://creativecommons.org/licenses/by/4.0/This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms. |
spellingShingle | Public Health Zhao, Wenchao He, Haibo Analysis of factors affecting the construction duration of public health emergency medical facilities |
title | Analysis of factors affecting the construction duration of public health emergency medical facilities |
title_full | Analysis of factors affecting the construction duration of public health emergency medical facilities |
title_fullStr | Analysis of factors affecting the construction duration of public health emergency medical facilities |
title_full_unstemmed | Analysis of factors affecting the construction duration of public health emergency medical facilities |
title_short | Analysis of factors affecting the construction duration of public health emergency medical facilities |
title_sort | analysis of factors affecting the construction duration of public health emergency medical facilities |
topic | Public Health |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10192559/ https://www.ncbi.nlm.nih.gov/pubmed/37213653 http://dx.doi.org/10.3389/fpubh.2023.1162804 |
work_keys_str_mv | AT zhaowenchao analysisoffactorsaffectingtheconstructiondurationofpublichealthemergencymedicalfacilities AT hehaibo analysisoffactorsaffectingtheconstructiondurationofpublichealthemergencymedicalfacilities |