Cargando…

Analysis of factors affecting the construction duration of public health emergency medical facilities

OBJECTIVES: This study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced. METHODS: Combining 30 relevant emergency medical facility construction cases in different cities in China from 2020 to 2021, sev...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhao, Wenchao, He, Haibo
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Frontiers Media S.A. 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10192559/
https://www.ncbi.nlm.nih.gov/pubmed/37213653
http://dx.doi.org/10.3389/fpubh.2023.1162804
_version_ 1785043648159678464
author Zhao, Wenchao
He, Haibo
author_facet Zhao, Wenchao
He, Haibo
author_sort Zhao, Wenchao
collection PubMed
description OBJECTIVES: This study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced. METHODS: Combining 30 relevant emergency medical facility construction cases in different cities in China from 2020 to 2021, seven condition variables and an outcome variable were selected, and necessary and sufficient condition analyses of duration influence factors were conducted using the fsQCA method. RESULTS: The consistency of seven condition variables was <0.9, which shows that the construction period of public health emergency medical facilities is not independently affected by a single condition variable but by multiple influencing factors. The solution consistency value of the path configurations was 0.905, indicating that four path configurations were sufficient for the outcome variables. The solution coverage of the four path configurations was 0.637, indicating that they covered ~63.7% of the public health emergency medical facility cases. CONCLUSION: To reduce the construction duration, the construction of emergency medical facilities should focus on planning and design, the selection of an appropriate form of construction, the reasonable deployment of resources, and the vigorous adoption of information technology.
format Online
Article
Text
id pubmed-10192559
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Frontiers Media S.A.
record_format MEDLINE/PubMed
spelling pubmed-101925592023-05-19 Analysis of factors affecting the construction duration of public health emergency medical facilities Zhao, Wenchao He, Haibo Front Public Health Public Health OBJECTIVES: This study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced. METHODS: Combining 30 relevant emergency medical facility construction cases in different cities in China from 2020 to 2021, seven condition variables and an outcome variable were selected, and necessary and sufficient condition analyses of duration influence factors were conducted using the fsQCA method. RESULTS: The consistency of seven condition variables was <0.9, which shows that the construction period of public health emergency medical facilities is not independently affected by a single condition variable but by multiple influencing factors. The solution consistency value of the path configurations was 0.905, indicating that four path configurations were sufficient for the outcome variables. The solution coverage of the four path configurations was 0.637, indicating that they covered ~63.7% of the public health emergency medical facility cases. CONCLUSION: To reduce the construction duration, the construction of emergency medical facilities should focus on planning and design, the selection of an appropriate form of construction, the reasonable deployment of resources, and the vigorous adoption of information technology. Frontiers Media S.A. 2023-05-04 /pmc/articles/PMC10192559/ /pubmed/37213653 http://dx.doi.org/10.3389/fpubh.2023.1162804 Text en Copyright © 2023 Zhao and He. https://creativecommons.org/licenses/by/4.0/This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
spellingShingle Public Health
Zhao, Wenchao
He, Haibo
Analysis of factors affecting the construction duration of public health emergency medical facilities
title Analysis of factors affecting the construction duration of public health emergency medical facilities
title_full Analysis of factors affecting the construction duration of public health emergency medical facilities
title_fullStr Analysis of factors affecting the construction duration of public health emergency medical facilities
title_full_unstemmed Analysis of factors affecting the construction duration of public health emergency medical facilities
title_short Analysis of factors affecting the construction duration of public health emergency medical facilities
title_sort analysis of factors affecting the construction duration of public health emergency medical facilities
topic Public Health
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10192559/
https://www.ncbi.nlm.nih.gov/pubmed/37213653
http://dx.doi.org/10.3389/fpubh.2023.1162804
work_keys_str_mv AT zhaowenchao analysisoffactorsaffectingtheconstructiondurationofpublichealthemergencymedicalfacilities
AT hehaibo analysisoffactorsaffectingtheconstructiondurationofpublichealthemergencymedicalfacilities