Cargando…
Research on production capacity planning method of open-pit coal mine
Reasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixi...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10227079/ https://www.ncbi.nlm.nih.gov/pubmed/37248405 http://dx.doi.org/10.1038/s41598-023-35967-y |
_version_ | 1785050692578181120 |
---|---|
author | Liu, Guangwei Guo, Weiqiang Chai, Senlin Li, Jiaming |
author_facet | Liu, Guangwei Guo, Weiqiang Chai, Senlin Li, Jiaming |
author_sort | Liu, Guangwei |
collection | PubMed |
description | Reasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixile open-pit coal mine as an example. The remaining unmined parts are divided into four regions, and the range of production capacity in each region is analyzed by the established model and the determined respectively. On this basis, three mining district division plans are proposed. By analyzing and comparing the stripping ratio, mining life of the district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes of each plan, Plan 3 is determined to be the optimal plan. The production capacity planning results of each mining district in this plan are as follows: the production capacity of the 3rd mining district is 30–35 Mt/a; the production capacity of the 4th mining district in Region 1 is 20–31 Mt/a, and the production capacity in Region 2 is 24–33 Mt/a; the production capacity of the 5th mining district is 20–27 Mt/a. |
format | Online Article Text |
id | pubmed-10227079 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Nature Publishing Group UK |
record_format | MEDLINE/PubMed |
spelling | pubmed-102270792023-05-31 Research on production capacity planning method of open-pit coal mine Liu, Guangwei Guo, Weiqiang Chai, Senlin Li, Jiaming Sci Rep Article Reasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixile open-pit coal mine as an example. The remaining unmined parts are divided into four regions, and the range of production capacity in each region is analyzed by the established model and the determined respectively. On this basis, three mining district division plans are proposed. By analyzing and comparing the stripping ratio, mining life of the district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes of each plan, Plan 3 is determined to be the optimal plan. The production capacity planning results of each mining district in this plan are as follows: the production capacity of the 3rd mining district is 30–35 Mt/a; the production capacity of the 4th mining district in Region 1 is 20–31 Mt/a, and the production capacity in Region 2 is 24–33 Mt/a; the production capacity of the 5th mining district is 20–27 Mt/a. Nature Publishing Group UK 2023-05-29 /pmc/articles/PMC10227079/ /pubmed/37248405 http://dx.doi.org/10.1038/s41598-023-35967-y Text en © The Author(s) 2023 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Article Liu, Guangwei Guo, Weiqiang Chai, Senlin Li, Jiaming Research on production capacity planning method of open-pit coal mine |
title | Research on production capacity planning method of open-pit coal mine |
title_full | Research on production capacity planning method of open-pit coal mine |
title_fullStr | Research on production capacity planning method of open-pit coal mine |
title_full_unstemmed | Research on production capacity planning method of open-pit coal mine |
title_short | Research on production capacity planning method of open-pit coal mine |
title_sort | research on production capacity planning method of open-pit coal mine |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10227079/ https://www.ncbi.nlm.nih.gov/pubmed/37248405 http://dx.doi.org/10.1038/s41598-023-35967-y |
work_keys_str_mv | AT liuguangwei researchonproductioncapacityplanningmethodofopenpitcoalmine AT guoweiqiang researchonproductioncapacityplanningmethodofopenpitcoalmine AT chaisenlin researchonproductioncapacityplanningmethodofopenpitcoalmine AT lijiaming researchonproductioncapacityplanningmethodofopenpitcoalmine |