Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context

The COVID-19 disease has caused a drastic stoppage in the construction industry as a result of quarantines. For this reason, this study focuses on the workforce scheduling problem when working under COVID labor distancing constraints, and additional costs derived from deviation hours or hiring new e...

Descripción completa

Detalles Bibliográficos
Autores principales: Corral, Federico, Forcael, Eric, Linfati, Rodrigo
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10239290/
https://www.ncbi.nlm.nih.gov/pubmed/37292343
http://dx.doi.org/10.1016/j.heliyon.2023.e16745
_version_ 1785053471595036672
author Corral, Federico
Forcael, Eric
Linfati, Rodrigo
author_facet Corral, Federico
Forcael, Eric
Linfati, Rodrigo
author_sort Corral, Federico
collection PubMed
description The COVID-19 disease has caused a drastic stoppage in the construction industry as a result of quarantines. For this reason, this study focuses on the workforce scheduling problem when working under COVID labor distancing constraints, and additional costs derived from deviation hours or hiring new employees that managers must assume on a project due to circumstances. A multi-objective mixed integer linear programming model was developed and solved using weighting and epsilon constraint methods to evaluate workforce scheduling and the mentioned COVID costs. The first objective function corresponds to the sum of the total extra hours; the second objective function represents the total non-worked but paid hours. Two sets of experiments are presented, the first based on a design of experiments that seeks to determine the relationship between the proposed objective functions and a methodology to determine the cost of considering COVID constraints. The second set of experiments was applied in a real company, where the situation without COVID vs with COVID, and without allowing extra hours vs with COVID allowing extra hours were compared. Obtained results showed that hiring additional employees to the man-crew leads the company to increase the extra hours cost up to 104.25%, being more convenient to keep a workforce baseline and to pay extra hours costs. Therefore, the mathematical model could represent a potential tool for decision-making in the construction sector, regarding the effects of COVID-19 costs on workforce scheduling construction projects. Consequently, this work contributes to the construction industry by quantifying the impact of COVID-19 constraints and the associated costs, offering a proactive approach to address the challenges posed by the COVID-19 pandemic for the construction sector.
format Online
Article
Text
id pubmed-10239290
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-102392902023-06-05 Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context Corral, Federico Forcael, Eric Linfati, Rodrigo Heliyon Research Article The COVID-19 disease has caused a drastic stoppage in the construction industry as a result of quarantines. For this reason, this study focuses on the workforce scheduling problem when working under COVID labor distancing constraints, and additional costs derived from deviation hours or hiring new employees that managers must assume on a project due to circumstances. A multi-objective mixed integer linear programming model was developed and solved using weighting and epsilon constraint methods to evaluate workforce scheduling and the mentioned COVID costs. The first objective function corresponds to the sum of the total extra hours; the second objective function represents the total non-worked but paid hours. Two sets of experiments are presented, the first based on a design of experiments that seeks to determine the relationship between the proposed objective functions and a methodology to determine the cost of considering COVID constraints. The second set of experiments was applied in a real company, where the situation without COVID vs with COVID, and without allowing extra hours vs with COVID allowing extra hours were compared. Obtained results showed that hiring additional employees to the man-crew leads the company to increase the extra hours cost up to 104.25%, being more convenient to keep a workforce baseline and to pay extra hours costs. Therefore, the mathematical model could represent a potential tool for decision-making in the construction sector, regarding the effects of COVID-19 costs on workforce scheduling construction projects. Consequently, this work contributes to the construction industry by quantifying the impact of COVID-19 constraints and the associated costs, offering a proactive approach to address the challenges posed by the COVID-19 pandemic for the construction sector. Elsevier 2023-06-03 /pmc/articles/PMC10239290/ /pubmed/37292343 http://dx.doi.org/10.1016/j.heliyon.2023.e16745 Text en © 2023 The Authors https://creativecommons.org/licenses/by/4.0/This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Research Article
Corral, Federico
Forcael, Eric
Linfati, Rodrigo
Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
title Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
title_full Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
title_fullStr Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
title_full_unstemmed Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
title_short Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
title_sort workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the covid-19 context
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10239290/
https://www.ncbi.nlm.nih.gov/pubmed/37292343
http://dx.doi.org/10.1016/j.heliyon.2023.e16745
work_keys_str_mv AT corralfederico workforceschedulingefficiencyassessmentinconstructionprojectsthroughamultiobjectiveoptimizationmodelinthecovid19context
AT forcaeleric workforceschedulingefficiencyassessmentinconstructionprojectsthroughamultiobjectiveoptimizationmodelinthecovid19context
AT linfatirodrigo workforceschedulingefficiencyassessmentinconstructionprojectsthroughamultiobjectiveoptimizationmodelinthecovid19context