Cargando…

Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study

Optimising energy use in systems and buildings is crucial to reduce climate change. This paper aims to address the gap in knowledge for pico-hydropower (<5 kW) that has been identified as an area of untapped potential in the water industries. A literature review and multivariate analysis are used...

Descripción completa

Detalles Bibliográficos
Autores principales: Thyer, Sascha, White, Tony
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10250803/
https://www.ncbi.nlm.nih.gov/pubmed/37303507
http://dx.doi.org/10.1016/j.heliyon.2023.e16709
_version_ 1785055835359019008
author Thyer, Sascha
White, Tony
author_facet Thyer, Sascha
White, Tony
author_sort Thyer, Sascha
collection PubMed
description Optimising energy use in systems and buildings is crucial to reduce climate change. This paper aims to address the gap in knowledge for pico-hydropower (<5 kW) that has been identified as an area of untapped potential in the water industries. A literature review and multivariate analysis are used to find a suitable pico-hydro turbine to install into a coral reef aquarium system in a government owned facility. Key findings from the literature review are untapped potential, gaps in knowledge and global quantification of small hydropower for energy recovery, and lack of enabling data contributing to slow uptake of small hydropower. The study showed a propeller pico-hydropower turbine could be used to recover approximately 10% of the energy used for pumping water through a filtration system. At 2.3 m available head, and 90 L/s water flow, power output up to 1.124 kW was achieved. The project was economically viable with financial and non-financial benefits for the life cycle of the product. There remain sparse case studies for energy recovery using small hydropower in the scientific literature. A growing number of authors see the potential of this renewable energy technology to reduce global greenhouse gas emissions and contribute to the UN Sustainable Development Goals to provide affordable clean energy and address climate change. This study helps to shine a light on opportunities to find value from waste using a novel application of hydropower in a water industry.
format Online
Article
Text
id pubmed-10250803
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-102508032023-06-10 Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study Thyer, Sascha White, Tony Heliyon Research Article Optimising energy use in systems and buildings is crucial to reduce climate change. This paper aims to address the gap in knowledge for pico-hydropower (<5 kW) that has been identified as an area of untapped potential in the water industries. A literature review and multivariate analysis are used to find a suitable pico-hydro turbine to install into a coral reef aquarium system in a government owned facility. Key findings from the literature review are untapped potential, gaps in knowledge and global quantification of small hydropower for energy recovery, and lack of enabling data contributing to slow uptake of small hydropower. The study showed a propeller pico-hydropower turbine could be used to recover approximately 10% of the energy used for pumping water through a filtration system. At 2.3 m available head, and 90 L/s water flow, power output up to 1.124 kW was achieved. The project was economically viable with financial and non-financial benefits for the life cycle of the product. There remain sparse case studies for energy recovery using small hydropower in the scientific literature. A growing number of authors see the potential of this renewable energy technology to reduce global greenhouse gas emissions and contribute to the UN Sustainable Development Goals to provide affordable clean energy and address climate change. This study helps to shine a light on opportunities to find value from waste using a novel application of hydropower in a water industry. Elsevier 2023-05-26 /pmc/articles/PMC10250803/ /pubmed/37303507 http://dx.doi.org/10.1016/j.heliyon.2023.e16709 Text en © 2023 The Authors https://creativecommons.org/licenses/by-nc-nd/4.0/This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
spellingShingle Research Article
Thyer, Sascha
White, Tony
Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
title Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
title_full Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
title_fullStr Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
title_full_unstemmed Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
title_short Energy recovery in a commercial building using pico-hydropower turbines: An Australian case study
title_sort energy recovery in a commercial building using pico-hydropower turbines: an australian case study
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10250803/
https://www.ncbi.nlm.nih.gov/pubmed/37303507
http://dx.doi.org/10.1016/j.heliyon.2023.e16709
work_keys_str_mv AT thyersascha energyrecoveryinacommercialbuildingusingpicohydropowerturbinesanaustraliancasestudy
AT whitetony energyrecoveryinacommercialbuildingusingpicohydropowerturbinesanaustraliancasestudy