Cargando…
Integrating Continuous and Batch Processes with Shared Resources in Closed-Loop Scheduling: A Case Study on Tuna Cannery
[Image: see text] Scheduling tasks in production facilities are usually hybrid optimization problems of a large combinatorial nature. They involve solving, in near-real time, the integration of the operation of several batch units of continuous dynamics with the discrete manufacture of items in proc...
Autores principales: | Palacín, Carlos G., Pitarch, José L., Vilas, Carlos, de Prada, César |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
American Chemical Society
2023
|
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10275496/ https://www.ncbi.nlm.nih.gov/pubmed/37333488 http://dx.doi.org/10.1021/acs.iecr.3c00754 |
Ejemplares similares
-
Los arrabales de Cannery
por: Steinbeck, John, 1902-1968
Publicado: (1945) -
Los arrabales de Cannery /
por: Steinbeck, John, 1902-1968
Publicado: (1945) -
Reproductive Schedules in Southern Bluefin Tuna: Are Current Assumptions Appropriate?
por: Evans, Karen, et al.
Publicado: (2012) -
Sharing server nodes for storage and compute Batch on EOS Extra Resources
por: Schulz, Markus, et al.
Publicado: (2018) -
Determination of in situ degradation parameters and feeding level of pineapple (Ananas comosus L.) cannery by-product to Hanwoo steers
por: Choi, Yongjun, et al.
Publicado: (2021)