Cargando…
Coupling physical selection with biological selection for the startup of a pilot-scale, continuous flow, aerobic granular sludge reactor without treatment interruption
This study removes two technical constraints for transitioning full-scale activated sludge infrastructure to continuous flow, aerobic granular sludge (AGS) facilities. The first of these is the loss of treatment capacity as a result of the rapid washout of flocculent sludge inventory and in turn the...
Autores principales: | An, Zhaohui, Wang, Jiefu, Zhang, Xueyao, Bott, Charles B., Angelotti, Bob, Brooks, Matt, Wang, Zhi-Wu |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10276156/ https://www.ncbi.nlm.nih.gov/pubmed/37332326 http://dx.doi.org/10.1016/j.wroa.2023.100186 |
Ejemplares similares
-
Support Vector Regression Modelling of an Aerobic Granular Sludge in Sequential Batch Reactor
por: Ahmad Yasmin, Nur Sakinah, et al.
Publicado: (2021) -
The Impact of Different Powdered Mineral Materials on Selected Properties of Aerobic Granular Sludge
por: Czarnota, Joanna, et al.
Publicado: (2020) -
Nitrogen Removal over Nitrite by Aeration Control in Aerobic Granular Sludge Sequencing Batch Reactors
por: Lochmatter, Samuel, et al.
Publicado: (2014) -
Heterogeneous diffusion in aerobic granular sludge
por: van den Berg, Lenno, et al.
Publicado: (2020) -
Hydrolysis capacity of different sized granules in a full-scale aerobic granular sludge (AGS) reactor
por: Toja Ortega, Sara, et al.
Publicado: (2022)