Cargando…

Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users

AIMS: The working interface between inpatient and community mental health teams can ensure a smooth and safe transition for service users following admission to the hospital. It is the first opportunity to reassess this aspect of service after the pandemic as the original audit was done before the l...

Descripción completa

Detalles Bibliográficos
Autor principal: Hakeem, Michel
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Cambridge University Press 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10345290/
http://dx.doi.org/10.1192/bjo.2023.428
_version_ 1785073054089478144
author Hakeem, Michel
author_facet Hakeem, Michel
author_sort Hakeem, Michel
collection PubMed
description AIMS: The working interface between inpatient and community mental health teams can ensure a smooth and safe transition for service users following admission to the hospital. It is the first opportunity to reassess this aspect of service after the pandemic as the original audit was done before the lockdown. To follow up on amber results and to identify if the data captured from the previous audit has improved. This clinical audit project also reviewed how often community mental health teams and service users met during a patient's inpatient stay. METHODS: The audit was conducted at West Park Hospital, Darlington. Information was collated from a consecutive group of female inpatients that were discharged from Elm Ward between 01/02/2021 and 23/03/2021. The audit data collection was performed between 01/05/2021 and 31/05/2021. Data were collected retrospectively and was obtained from the inpatient medical records system (PARIS), and input into a designated audit tool. Medical records were reviewed for the duration of each inpatient episode, and the criteria and standards above were applied. RESULTS: The data demonstrate that in the vast majority of cases, the ward invited the community team to the relevant meetings during the patient admission (96%) which indicates the improvement in compliance with virtual meetings. In 100% of cases, there were contacts between the community team through MS Teams or directly through phone or face to face (the number of contacts depends on the length of admission, shown in the figure below). The percentage of patients that were offered a written copy of the care plan was observed to have increased when this is compared to the original Audit. The percentage of patients whose GP doctor was informed also increased to 20%, however, that is still at red remarks. CONCLUSION: An amber compliance rating was assigned to this clinical audit report. High compliance was achieved for evidence of the reason for admission, anticipated risks, and capacity communicated to the ward by the care coordinator/crisis team. There is evidence of inviting the care coordinator/crisis team staff to the initial formulation meeting and review/MDT meetings. However, some elements of the Admission, Transfer, and Discharge policy required improvements, particularly in relation to information about expected length of stay communicated to the ward by care coordinators/crisis team staff. It should be clear who should be responsible to inform the patient's GP within 24 hours of admission. Still, compliance with offering patients a written copy of the care plan (care document/ intervention plan), is low.
format Online
Article
Text
id pubmed-10345290
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Cambridge University Press
record_format MEDLINE/PubMed
spelling pubmed-103452902023-07-15 Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users Hakeem, Michel BJPsych Open Audit AIMS: The working interface between inpatient and community mental health teams can ensure a smooth and safe transition for service users following admission to the hospital. It is the first opportunity to reassess this aspect of service after the pandemic as the original audit was done before the lockdown. To follow up on amber results and to identify if the data captured from the previous audit has improved. This clinical audit project also reviewed how often community mental health teams and service users met during a patient's inpatient stay. METHODS: The audit was conducted at West Park Hospital, Darlington. Information was collated from a consecutive group of female inpatients that were discharged from Elm Ward between 01/02/2021 and 23/03/2021. The audit data collection was performed between 01/05/2021 and 31/05/2021. Data were collected retrospectively and was obtained from the inpatient medical records system (PARIS), and input into a designated audit tool. Medical records were reviewed for the duration of each inpatient episode, and the criteria and standards above were applied. RESULTS: The data demonstrate that in the vast majority of cases, the ward invited the community team to the relevant meetings during the patient admission (96%) which indicates the improvement in compliance with virtual meetings. In 100% of cases, there were contacts between the community team through MS Teams or directly through phone or face to face (the number of contacts depends on the length of admission, shown in the figure below). The percentage of patients that were offered a written copy of the care plan was observed to have increased when this is compared to the original Audit. The percentage of patients whose GP doctor was informed also increased to 20%, however, that is still at red remarks. CONCLUSION: An amber compliance rating was assigned to this clinical audit report. High compliance was achieved for evidence of the reason for admission, anticipated risks, and capacity communicated to the ward by the care coordinator/crisis team. There is evidence of inviting the care coordinator/crisis team staff to the initial formulation meeting and review/MDT meetings. However, some elements of the Admission, Transfer, and Discharge policy required improvements, particularly in relation to information about expected length of stay communicated to the ward by care coordinators/crisis team staff. It should be clear who should be responsible to inform the patient's GP within 24 hours of admission. Still, compliance with offering patients a written copy of the care plan (care document/ intervention plan), is low. Cambridge University Press 2023-07-07 /pmc/articles/PMC10345290/ http://dx.doi.org/10.1192/bjo.2023.428 Text en © The Author(s) 2023 https://creativecommons.org/licenses/by-nc/4.0/This is an Open Access article, distributed under the terms of the Creative Commons Attribution licence (http://creativecommons.org/licenses/by-nc/4.0), which permits unrestricted re-use, distribution, and reproduction in any medium, provided the original work is properly cited. This does not need to be placed under each abstract, just each page is fine.
spellingShingle Audit
Hakeem, Michel
Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users
title Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users
title_full Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users
title_fullStr Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users
title_full_unstemmed Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users
title_short Clinical Re-Audit of the Interface Between Community and Inpatient Management of Service Users
title_sort clinical re-audit of the interface between community and inpatient management of service users
topic Audit
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10345290/
http://dx.doi.org/10.1192/bjo.2023.428
work_keys_str_mv AT hakeemmichel clinicalreauditoftheinterfacebetweencommunityandinpatientmanagementofserviceusers