Cargando…
Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study
The construction practice of water conveyance tunnels often encounters various complex geotechnical engineering conditions, which bring huge challenges to the design and construction of water conveyance tunnels. Based on the theory of rock elastic–plastic mechanics and finite element analysis techno...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10497501/ https://www.ncbi.nlm.nih.gov/pubmed/37699948 http://dx.doi.org/10.1038/s41598-023-42192-0 |
_version_ | 1785105313954791424 |
---|---|
author | Duan, Kaimin Zhang, Guofeng Sun, Hui |
author_facet | Duan, Kaimin Zhang, Guofeng Sun, Hui |
author_sort | Duan, Kaimin |
collection | PubMed |
description | The construction practice of water conveyance tunnels often encounters various complex geotechnical engineering conditions, which bring huge challenges to the design and construction of water conveyance tunnels. Based on the theory of rock elastic–plastic mechanics and finite element analysis technology, this article carried out investigations of engineering geological features, geological formations and hydrological conditions establishes a calculation model for the 3# water conveyance tunnel of the Fenhe River Diversion Project, and analyzes the variation law of surrounding rock stress and displacement during TBM excavation of the tunnel. The results indicate that the dominant direction of the rock mass principal stress measured by the hydraulic fracturing method is NE84°, and the maximum horizontal principal stress, minimum horizontal principal stress, and vertical stress decrease sequentially, analyzing the characteristics of shield TBM construction technology, it is applied to the construction of water transfer tunnels. The numerical simulation of TBM construction using FLAC3D software shows that as the excavation surface advances, the subsidence value of the tunnel roof first slowly increases, then rapidly increases, and then tends to stabilize. The horizontal displacement of the surrounding rock is increasing. The maximum principal stress of the surrounding rock gradually increases. The final surrounding rock stress is 35 MPa. The TBM shield machine with mud water balance driven by indirectly controlled frequency conversion motor is selected for TBM construction of the tunnel. The study offers statistical information to support tunneling technology for water conveyance in the geotechnical engineering practice. |
format | Online Article Text |
id | pubmed-10497501 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Nature Publishing Group UK |
record_format | MEDLINE/PubMed |
spelling | pubmed-104975012023-09-14 Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study Duan, Kaimin Zhang, Guofeng Sun, Hui Sci Rep Article The construction practice of water conveyance tunnels often encounters various complex geotechnical engineering conditions, which bring huge challenges to the design and construction of water conveyance tunnels. Based on the theory of rock elastic–plastic mechanics and finite element analysis technology, this article carried out investigations of engineering geological features, geological formations and hydrological conditions establishes a calculation model for the 3# water conveyance tunnel of the Fenhe River Diversion Project, and analyzes the variation law of surrounding rock stress and displacement during TBM excavation of the tunnel. The results indicate that the dominant direction of the rock mass principal stress measured by the hydraulic fracturing method is NE84°, and the maximum horizontal principal stress, minimum horizontal principal stress, and vertical stress decrease sequentially, analyzing the characteristics of shield TBM construction technology, it is applied to the construction of water transfer tunnels. The numerical simulation of TBM construction using FLAC3D software shows that as the excavation surface advances, the subsidence value of the tunnel roof first slowly increases, then rapidly increases, and then tends to stabilize. The horizontal displacement of the surrounding rock is increasing. The maximum principal stress of the surrounding rock gradually increases. The final surrounding rock stress is 35 MPa. The TBM shield machine with mud water balance driven by indirectly controlled frequency conversion motor is selected for TBM construction of the tunnel. The study offers statistical information to support tunneling technology for water conveyance in the geotechnical engineering practice. Nature Publishing Group UK 2023-09-12 /pmc/articles/PMC10497501/ /pubmed/37699948 http://dx.doi.org/10.1038/s41598-023-42192-0 Text en © The Author(s) 2023 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Article Duan, Kaimin Zhang, Guofeng Sun, Hui Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
title | Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
title_full | Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
title_fullStr | Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
title_full_unstemmed | Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
title_short | Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
title_sort | construction practice of water conveyance tunnel among complex geotechnical conditions: a case study |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10497501/ https://www.ncbi.nlm.nih.gov/pubmed/37699948 http://dx.doi.org/10.1038/s41598-023-42192-0 |
work_keys_str_mv | AT duankaimin constructionpracticeofwaterconveyancetunnelamongcomplexgeotechnicalconditionsacasestudy AT zhangguofeng constructionpracticeofwaterconveyancetunnelamongcomplexgeotechnicalconditionsacasestudy AT sunhui constructionpracticeofwaterconveyancetunnelamongcomplexgeotechnicalconditionsacasestudy |