Cargando…
Road pavement upgrade scheduling accounting for minimizing congestion
Road pavement maintenance and upgrades (RPU) need to be scheduled in a way that minimises congestion across the road network and matches the schedule with the availability of equipment and skilled labourers to ensure that they are completed on time. RPU should not introduce unbearable congestion aro...
Autores principales: | Rupasinghe, Bhagya, Wallace, Mark, Gange, Graeme, Senthooran, Ilankaikone |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10505204/ https://www.ncbi.nlm.nih.gov/pubmed/37717017 http://dx.doi.org/10.1038/s41598-023-40945-5 |
Ejemplares similares
-
Nurse rostering with fatigue modelling: Incorporating a validated sleep model with biological variations in nurse rostering
por: Klyve, Kjartan Kastet, et al.
Publicado: (2022) -
Adaptive Road Crack Detection System by Pavement Classification
por: Gavilán, Miguel, et al.
Publicado: (2011) -
Improving scheduling performance in congested networks
por: Husen, Arif, et al.
Publicado: (2021) -
Scheduling and congestion control for wireless internet
por: Wang, Xin
Publicado: (2014) -
ROADS—Rover for Bituminous Pavement Distress Survey: An Unmanned Ground Vehicle (UGV) Prototype for Pavement Distress Evaluation
por: Mei, Alessandro, et al.
Publicado: (2022)