Cargando…

Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors

To provide data support for developing fixed-route DRT based on FRT to reduce operating costs inside base routes in urban-rural traffic corridors, this paper estimated running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors. Firstly, 14 urban-rural b...

Descripción completa

Detalles Bibliográficos
Autores principales: Li, Xiuhai, Yu, Zhan, Guo, Peipei, Yu, Shaowei
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10506712/
https://www.ncbi.nlm.nih.gov/pubmed/37721933
http://dx.doi.org/10.1371/journal.pone.0290903
_version_ 1785107161813090304
author Li, Xiuhai
Yu, Zhan
Guo, Peipei
Yu, Shaowei
author_facet Li, Xiuhai
Yu, Zhan
Guo, Peipei
Yu, Shaowei
author_sort Li, Xiuhai
collection PubMed
description To provide data support for developing fixed-route DRT based on FRT to reduce operating costs inside base routes in urban-rural traffic corridors, this paper estimated running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors. Firstly, 14 urban-rural bus routes without ticket sellers in Xi’an are selected to demonstrate the universality of unproductive stops at bus stations. Secondly, a model for estimating running time and energy losses based on the VT-CPFM model is developed. Finally, running time and energy losses due to unproductive stops in two representative urban-rural traffic corridors are estimated. Estimated results show that the average running time loss ratios of different rounds in Routes 332, 333, 335, 338 and G1 range from 8.30% to 17.52% and that average fuel loss ratios range from 9.16% to 13.30%. In addition, the monetary loss in energy consumption of Route G1 in 2019 is estimated to be up to 193213 yuan. This study proves that unproductive stops at bus stations generally exist in urban-rural bus routes and can result in significant running time and energy losses and that developing fixed-route DRT based on FRT leveraging V2I with mobile APP in representative urban-rural traffic corridors is very necessary, which is expected to reduce energy consumption and running time.
format Online
Article
Text
id pubmed-10506712
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Public Library of Science
record_format MEDLINE/PubMed
spelling pubmed-105067122023-09-19 Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors Li, Xiuhai Yu, Zhan Guo, Peipei Yu, Shaowei PLoS One Research Article To provide data support for developing fixed-route DRT based on FRT to reduce operating costs inside base routes in urban-rural traffic corridors, this paper estimated running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors. Firstly, 14 urban-rural bus routes without ticket sellers in Xi’an are selected to demonstrate the universality of unproductive stops at bus stations. Secondly, a model for estimating running time and energy losses based on the VT-CPFM model is developed. Finally, running time and energy losses due to unproductive stops in two representative urban-rural traffic corridors are estimated. Estimated results show that the average running time loss ratios of different rounds in Routes 332, 333, 335, 338 and G1 range from 8.30% to 17.52% and that average fuel loss ratios range from 9.16% to 13.30%. In addition, the monetary loss in energy consumption of Route G1 in 2019 is estimated to be up to 193213 yuan. This study proves that unproductive stops at bus stations generally exist in urban-rural bus routes and can result in significant running time and energy losses and that developing fixed-route DRT based on FRT leveraging V2I with mobile APP in representative urban-rural traffic corridors is very necessary, which is expected to reduce energy consumption and running time. Public Library of Science 2023-09-18 /pmc/articles/PMC10506712/ /pubmed/37721933 http://dx.doi.org/10.1371/journal.pone.0290903 Text en © 2023 Li et al https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/) , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
spellingShingle Research Article
Li, Xiuhai
Yu, Zhan
Guo, Peipei
Yu, Shaowei
Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
title Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
title_full Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
title_fullStr Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
title_full_unstemmed Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
title_short Estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
title_sort estimation for running time and energy losses due to unproductive stops at bus stations in urban-rural traffic corridors
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10506712/
https://www.ncbi.nlm.nih.gov/pubmed/37721933
http://dx.doi.org/10.1371/journal.pone.0290903
work_keys_str_mv AT lixiuhai estimationforrunningtimeandenergylossesduetounproductivestopsatbusstationsinurbanruraltrafficcorridors
AT yuzhan estimationforrunningtimeandenergylossesduetounproductivestopsatbusstationsinurbanruraltrafficcorridors
AT guopeipei estimationforrunningtimeandenergylossesduetounproductivestopsatbusstationsinurbanruraltrafficcorridors
AT yushaowei estimationforrunningtimeandenergylossesduetounproductivestopsatbusstationsinurbanruraltrafficcorridors