Cargando…
Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
Numerous studies on project scheduling only consider a single factor, which fails to reflect the actual environment of project operations. In light of this issue, the article synthesizes multiple perspectives and proposes a multi-skill resource-based multi-modal project scheduling problem (MRCMPSP)....
Autores principales: | Peng, Jun Long, Liu, Xiao, Peng, Chao, Shao, Yu |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10613272/ https://www.ncbi.nlm.nih.gov/pubmed/37898683 http://dx.doi.org/10.1038/s41598-023-45970-y |
Ejemplares similares
-
Scheduling of resource-constrained projects
por: Klein, Robert
Publicado: (2000) -
An Improved African Vulture Optimization Algorithm for Dual-Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problems
por: He, Zhou, et al.
Publicado: (2022) -
Search graph structure and its implications for multi-graph constrained routing and scheduling problems
por: Weiszer, Michal, et al.
Publicado: (2022) -
Instance dataset for resource-constrained project scheduling with diverging material flows
por: Gehring, Marco, et al.
Publicado: (2023) -
An Improved Genetic Algorithm for Solving the Multi-AGV Flexible Job Shop Scheduling Problem
por: Meng, Leilei, et al.
Publicado: (2023)