Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks
Modern fault ride-through (FRT) standards in many countries require distributed generators to remain connected for a specified period during the fault by providing reactive current, to support voltage and prevent a massive renewable outage. As a result, short-circuit current is not constant, but it...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10647489/ https://www.ncbi.nlm.nih.gov/pubmed/37960570 http://dx.doi.org/10.3390/s23218868 |
_version_ | 1785135119076425728 |
---|---|
author | Pompodakis, Evangelos E. Katsigiannis, Yiannis Karapidakis, Emmanuel S. |
author_facet | Pompodakis, Evangelos E. Katsigiannis, Yiannis Karapidakis, Emmanuel S. |
author_sort | Pompodakis, Evangelos E. |
collection | PubMed |
description | Modern fault ride-through (FRT) standards in many countries require distributed generators to remain connected for a specified period during the fault by providing reactive current, to support voltage and prevent a massive renewable outage. As a result, short-circuit current is not constant, but it varies depending on the current and disconnection order of distributed generators (DGs). This time-varying short-circuit current complicates the estimation of the time it will take for an overcurrent relay or fuse to trip. The existing short-circuit calculation algorithms usually assume that the fault current is constant throughout the whole period of fault. This assumption may result in incorrect conclusions regarding the tripping time of protective devices in networks with high renewable penetration. This paper incorporates modern FRT standards into the fault analysis by considering the influence of fault current variations on the protective devices (relays, fuses), significantly increasing the accuracy of the estimated tripping time. Simulations carried out in a 13-bus and the IEEE 8500-node network indicate that the traditional short-circuit calculation approaches may miscalculate the tripping time of protective devices, with deviations up to 80 s, when applied to networks complying with modern FRT standards. |
format | Online Article Text |
id | pubmed-10647489 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-106474892023-10-31 Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks Pompodakis, Evangelos E. Katsigiannis, Yiannis Karapidakis, Emmanuel S. Sensors (Basel) Article Modern fault ride-through (FRT) standards in many countries require distributed generators to remain connected for a specified period during the fault by providing reactive current, to support voltage and prevent a massive renewable outage. As a result, short-circuit current is not constant, but it varies depending on the current and disconnection order of distributed generators (DGs). This time-varying short-circuit current complicates the estimation of the time it will take for an overcurrent relay or fuse to trip. The existing short-circuit calculation algorithms usually assume that the fault current is constant throughout the whole period of fault. This assumption may result in incorrect conclusions regarding the tripping time of protective devices in networks with high renewable penetration. This paper incorporates modern FRT standards into the fault analysis by considering the influence of fault current variations on the protective devices (relays, fuses), significantly increasing the accuracy of the estimated tripping time. Simulations carried out in a 13-bus and the IEEE 8500-node network indicate that the traditional short-circuit calculation approaches may miscalculate the tripping time of protective devices, with deviations up to 80 s, when applied to networks complying with modern FRT standards. MDPI 2023-10-31 /pmc/articles/PMC10647489/ /pubmed/37960570 http://dx.doi.org/10.3390/s23218868 Text en © 2023 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Pompodakis, Evangelos E. Katsigiannis, Yiannis Karapidakis, Emmanuel S. Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks |
title | Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks |
title_full | Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks |
title_fullStr | Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks |
title_full_unstemmed | Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks |
title_short | Incorporating Modern Fault Ride-Through Standards into the Short-Circuit Calculation of Distribution Networks |
title_sort | incorporating modern fault ride-through standards into the short-circuit calculation of distribution networks |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10647489/ https://www.ncbi.nlm.nih.gov/pubmed/37960570 http://dx.doi.org/10.3390/s23218868 |
work_keys_str_mv | AT pompodakisevangelose incorporatingmodernfaultridethroughstandardsintotheshortcircuitcalculationofdistributionnetworks AT katsigiannisyiannis incorporatingmodernfaultridethroughstandardsintotheshortcircuitcalculationofdistributionnetworks AT karapidakisemmanuels incorporatingmodernfaultridethroughstandardsintotheshortcircuitcalculationofdistributionnetworks |