Cargando…
Uncertainty analysis on flood routing of embankment dam breach due to overtopping failure
The breach risk of reservoir dam exists objectively while exerting benefits. There is great uncertainty in the overtopping breach process of embankment dam and the dam break flood routing which affects the accuracy of dam risk analysis and may cause unnecessary waste in emergency scheduling. However...
Autores principales: | Yang, Miaofan, Cai, Qian, Li, Zhuo, Yang, Jiangui |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10656473/ https://www.ncbi.nlm.nih.gov/pubmed/37978213 http://dx.doi.org/10.1038/s41598-023-47542-6 |
Ejemplares similares
-
Study on the freeze–thaw effect on concrete arch dam using an improved response surface method
por: Cai, Qian, et al.
Publicado: (2023) -
Dam-Breach hydrology of the Johnstown flood of 1889–challenging the findings of the 1891 investigation report
por: Coleman, Neil M., et al.
Publicado: (2016) -
Assessment of life loss due to dam breach using improved variable fuzzy method
por: Jiao, Hongbo, et al.
Publicado: (2022) -
Dataset on the innovation remediation technology of embankment dams by using suitable types of alternative raw materials
por: Rostislav, Drochytka, et al.
Publicado: (2018) -
Dynamic Characteristics of Asphalt Concrete as an Impervious Core in Embankment Dams under Varying Temperatures and Stress States
por: Han, Xiaoning, et al.
Publicado: (2023)