Cargando…

Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007

INTRODUCTION: Recreational and transportation infrastructure can promote physical activity among children and adolescents. The Play Across Boston community-based research project sought to estimate and compare playground renovation rates across Boston areas before and after a playground quality asse...

Descripción completa

Detalles Bibliográficos
Autores principales: Barrett, Jessica L., Hannon, Cynthia, Keefe, Linda, Gortmaker, Steven L., Cradock, Angie L.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Centers for Disease Control and Prevention 2011
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3136986/
https://www.ncbi.nlm.nih.gov/pubmed/21672396
_version_ 1782208255512018944
author Barrett, Jessica L.
Hannon, Cynthia
Keefe, Linda
Gortmaker, Steven L.
Cradock, Angie L.
author_facet Barrett, Jessica L.
Hannon, Cynthia
Keefe, Linda
Gortmaker, Steven L.
Cradock, Angie L.
author_sort Barrett, Jessica L.
collection PubMed
description INTRODUCTION: Recreational and transportation infrastructure can promote physical activity among children and adolescents. The Play Across Boston community-based research project sought to estimate and compare playground renovation rates across Boston areas before and after a playground quality assessment, to describe changes in playground quality among a subset of parks, and to document features of local transportation infrastructure around parks. METHODS: We used an observational pretest-posttest design to estimate playground renovation rates among 103 city-operated parks. Renovation rates were calculated on the basis of annual city Parks Department capital budgets from fiscal years 1996 through 2007. We used the same design to describe changes between a 2000 to 2001 baseline assessment of playground quality and a 2007 follow-up measured via observation of a subsample of 18 low-scoring parks in disadvantaged areas. We used χ (2 )analysis to compare percentages of playgrounds renovated across city areas before and after baseline assessment, logistic regression analysis to calculate odds ratios comparing renovation rates after baseline by city area, and paired t tests to compare playground quality at baseline and follow-up. RESULTS: Overall playground renovation rates before (29%) and after (34%) baseline assessment were similar. Parks scoring low on playground quality at baseline were renovated after baseline at a higher rate than high-scoring playgrounds. After accounting for baseline playground quality, parks in disadvantaged areas were renovated at a rate similar to those in other areas. Playground quality scores improved between baseline (mean, 38.3; 95% confidence interval, 35.3-41.3) and 2007 in a subsample of previously low-scoring parks in disadvantaged areas. CONCLUSION: The findings of the 2007 follow-up assessment indicate an equitable rate of playground renovation across city areas according to need.
format Online
Article
Text
id pubmed-3136986
institution National Center for Biotechnology Information
language English
publishDate 2011
publisher Centers for Disease Control and Prevention
record_format MEDLINE/PubMed
spelling pubmed-31369862011-08-02 Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007 Barrett, Jessica L. Hannon, Cynthia Keefe, Linda Gortmaker, Steven L. Cradock, Angie L. Prev Chronic Dis Original Research INTRODUCTION: Recreational and transportation infrastructure can promote physical activity among children and adolescents. The Play Across Boston community-based research project sought to estimate and compare playground renovation rates across Boston areas before and after a playground quality assessment, to describe changes in playground quality among a subset of parks, and to document features of local transportation infrastructure around parks. METHODS: We used an observational pretest-posttest design to estimate playground renovation rates among 103 city-operated parks. Renovation rates were calculated on the basis of annual city Parks Department capital budgets from fiscal years 1996 through 2007. We used the same design to describe changes between a 2000 to 2001 baseline assessment of playground quality and a 2007 follow-up measured via observation of a subsample of 18 low-scoring parks in disadvantaged areas. We used χ (2 )analysis to compare percentages of playgrounds renovated across city areas before and after baseline assessment, logistic regression analysis to calculate odds ratios comparing renovation rates after baseline by city area, and paired t tests to compare playground quality at baseline and follow-up. RESULTS: Overall playground renovation rates before (29%) and after (34%) baseline assessment were similar. Parks scoring low on playground quality at baseline were renovated after baseline at a higher rate than high-scoring playgrounds. After accounting for baseline playground quality, parks in disadvantaged areas were renovated at a rate similar to those in other areas. Playground quality scores improved between baseline (mean, 38.3; 95% confidence interval, 35.3-41.3) and 2007 in a subsample of previously low-scoring parks in disadvantaged areas. CONCLUSION: The findings of the 2007 follow-up assessment indicate an equitable rate of playground renovation across city areas according to need. Centers for Disease Control and Prevention 2011-06-15 /pmc/articles/PMC3136986/ /pubmed/21672396 Text en https://creativecommons.org/licenses/by/4.0/This is a publication of the U.S. Government. This publication is in the public domain and is therefore without copyright. All text from this work may be reprinted freely. Use of these materials should be properly cited.
spellingShingle Original Research
Barrett, Jessica L.
Hannon, Cynthia
Keefe, Linda
Gortmaker, Steven L.
Cradock, Angie L.
Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007
title Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007
title_full Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007
title_fullStr Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007
title_full_unstemmed Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007
title_short Playground Renovations and Quality at Public Parks in Boston, Massachusetts, 1996-2007
title_sort playground renovations and quality at public parks in boston, massachusetts, 1996-2007
topic Original Research
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3136986/
https://www.ncbi.nlm.nih.gov/pubmed/21672396
work_keys_str_mv AT barrettjessical playgroundrenovationsandqualityatpublicparksinbostonmassachusetts19962007
AT hannoncynthia playgroundrenovationsandqualityatpublicparksinbostonmassachusetts19962007
AT keefelinda playgroundrenovationsandqualityatpublicparksinbostonmassachusetts19962007
AT gortmakerstevenl playgroundrenovationsandqualityatpublicparksinbostonmassachusetts19962007
AT cradockangiel playgroundrenovationsandqualityatpublicparksinbostonmassachusetts19962007