Cargando…

Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level

Instantaneous (discrete) and time-integrated (composed) samples were collected during a 19-week period in a watershed impacted by discontinuous discharges from local tanneries (Carpathians Mountains, Poland). Existence of the impoundment reservoir in this watershed allowed investigation of its role...

Descripción completa

Detalles Bibliográficos
Autores principales: Szalinska, Ewa, Smolicka, Agnieszka, Dominik, Janusz
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Springer-Verlag 2012
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3646159/
https://www.ncbi.nlm.nih.gov/pubmed/23224501
http://dx.doi.org/10.1007/s11356-012-1327-9
_version_ 1782268568038014976
author Szalinska, Ewa
Smolicka, Agnieszka
Dominik, Janusz
author_facet Szalinska, Ewa
Smolicka, Agnieszka
Dominik, Janusz
author_sort Szalinska, Ewa
collection PubMed
description Instantaneous (discrete) and time-integrated (composed) samples were collected during a 19-week period in a watershed impacted by discontinuous discharges from local tanneries (Carpathians Mountains, Poland). Existence of the impoundment reservoir in this watershed allowed investigation of its role in chromium transport. In collected samples, dissolved and particulate chromium concentrations were measured to apportion both loads. This study has demonstrated that the impoundment reservoir retains not only particulate but also a dissolved form of chromium and its efficiency reaches 74–94 %. Sampling results proved that chromium contamination in the investigated river is variable and discontinuous. Discrete sampling can lead to an underestimation of chromium contamination level (up to 78 %), especially when illegal/unexpected discharges occur in the watershed. A discrete sampling regime also produces less reliable data for contaminant budget calculations, especially in sites where strong variability of contamination is anticipated, while at the output from reservoirs, the load can be reasonably estimated using this mode of sampling.
format Online
Article
Text
id pubmed-3646159
institution National Center for Biotechnology Information
language English
publishDate 2012
publisher Springer-Verlag
record_format MEDLINE/PubMed
spelling pubmed-36461592013-05-07 Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level Szalinska, Ewa Smolicka, Agnieszka Dominik, Janusz Environ Sci Pollut Res Int Research Article Instantaneous (discrete) and time-integrated (composed) samples were collected during a 19-week period in a watershed impacted by discontinuous discharges from local tanneries (Carpathians Mountains, Poland). Existence of the impoundment reservoir in this watershed allowed investigation of its role in chromium transport. In collected samples, dissolved and particulate chromium concentrations were measured to apportion both loads. This study has demonstrated that the impoundment reservoir retains not only particulate but also a dissolved form of chromium and its efficiency reaches 74–94 %. Sampling results proved that chromium contamination in the investigated river is variable and discontinuous. Discrete sampling can lead to an underestimation of chromium contamination level (up to 78 %), especially when illegal/unexpected discharges occur in the watershed. A discrete sampling regime also produces less reliable data for contaminant budget calculations, especially in sites where strong variability of contamination is anticipated, while at the output from reservoirs, the load can be reasonably estimated using this mode of sampling. Springer-Verlag 2012-12-08 2013 /pmc/articles/PMC3646159/ /pubmed/23224501 http://dx.doi.org/10.1007/s11356-012-1327-9 Text en © The Author(s) 2012 https://creativecommons.org/licenses/by-nc/2.0/ Open Access This article is distributed under the terms of the Creative Commons Attribution License which permits any use, distribution, and reproduction in any medium, provided the original author(s) and the source are credited.
spellingShingle Research Article
Szalinska, Ewa
Smolicka, Agnieszka
Dominik, Janusz
Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
title Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
title_full Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
title_fullStr Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
title_full_unstemmed Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
title_short Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
title_sort discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3646159/
https://www.ncbi.nlm.nih.gov/pubmed/23224501
http://dx.doi.org/10.1007/s11356-012-1327-9
work_keys_str_mv AT szalinskaewa discreteandtimeintegratedsamplingforchromiumloadcalculationsinawatershedwithanimpoundmentreservoiratanexceptionallylowwaterlevel
AT smolickaagnieszka discreteandtimeintegratedsamplingforchromiumloadcalculationsinawatershedwithanimpoundmentreservoiratanexceptionallylowwaterlevel
AT dominikjanusz discreteandtimeintegratedsamplingforchromiumloadcalculationsinawatershedwithanimpoundmentreservoiratanexceptionallylowwaterlevel