Cargando…
Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level
Instantaneous (discrete) and time-integrated (composed) samples were collected during a 19-week period in a watershed impacted by discontinuous discharges from local tanneries (Carpathians Mountains, Poland). Existence of the impoundment reservoir in this watershed allowed investigation of its role...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer-Verlag
2012
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3646159/ https://www.ncbi.nlm.nih.gov/pubmed/23224501 http://dx.doi.org/10.1007/s11356-012-1327-9 |
_version_ | 1782268568038014976 |
---|---|
author | Szalinska, Ewa Smolicka, Agnieszka Dominik, Janusz |
author_facet | Szalinska, Ewa Smolicka, Agnieszka Dominik, Janusz |
author_sort | Szalinska, Ewa |
collection | PubMed |
description | Instantaneous (discrete) and time-integrated (composed) samples were collected during a 19-week period in a watershed impacted by discontinuous discharges from local tanneries (Carpathians Mountains, Poland). Existence of the impoundment reservoir in this watershed allowed investigation of its role in chromium transport. In collected samples, dissolved and particulate chromium concentrations were measured to apportion both loads. This study has demonstrated that the impoundment reservoir retains not only particulate but also a dissolved form of chromium and its efficiency reaches 74–94 %. Sampling results proved that chromium contamination in the investigated river is variable and discontinuous. Discrete sampling can lead to an underestimation of chromium contamination level (up to 78 %), especially when illegal/unexpected discharges occur in the watershed. A discrete sampling regime also produces less reliable data for contaminant budget calculations, especially in sites where strong variability of contamination is anticipated, while at the output from reservoirs, the load can be reasonably estimated using this mode of sampling. |
format | Online Article Text |
id | pubmed-3646159 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2012 |
publisher | Springer-Verlag |
record_format | MEDLINE/PubMed |
spelling | pubmed-36461592013-05-07 Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level Szalinska, Ewa Smolicka, Agnieszka Dominik, Janusz Environ Sci Pollut Res Int Research Article Instantaneous (discrete) and time-integrated (composed) samples were collected during a 19-week period in a watershed impacted by discontinuous discharges from local tanneries (Carpathians Mountains, Poland). Existence of the impoundment reservoir in this watershed allowed investigation of its role in chromium transport. In collected samples, dissolved and particulate chromium concentrations were measured to apportion both loads. This study has demonstrated that the impoundment reservoir retains not only particulate but also a dissolved form of chromium and its efficiency reaches 74–94 %. Sampling results proved that chromium contamination in the investigated river is variable and discontinuous. Discrete sampling can lead to an underestimation of chromium contamination level (up to 78 %), especially when illegal/unexpected discharges occur in the watershed. A discrete sampling regime also produces less reliable data for contaminant budget calculations, especially in sites where strong variability of contamination is anticipated, while at the output from reservoirs, the load can be reasonably estimated using this mode of sampling. Springer-Verlag 2012-12-08 2013 /pmc/articles/PMC3646159/ /pubmed/23224501 http://dx.doi.org/10.1007/s11356-012-1327-9 Text en © The Author(s) 2012 https://creativecommons.org/licenses/by-nc/2.0/ Open Access This article is distributed under the terms of the Creative Commons Attribution License which permits any use, distribution, and reproduction in any medium, provided the original author(s) and the source are credited. |
spellingShingle | Research Article Szalinska, Ewa Smolicka, Agnieszka Dominik, Janusz Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
title | Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
title_full | Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
title_fullStr | Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
title_full_unstemmed | Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
title_short | Discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
title_sort | discrete and time-integrated sampling for chromium load calculations in a watershed with an impoundment reservoir at an exceptionally low water level |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3646159/ https://www.ncbi.nlm.nih.gov/pubmed/23224501 http://dx.doi.org/10.1007/s11356-012-1327-9 |
work_keys_str_mv | AT szalinskaewa discreteandtimeintegratedsamplingforchromiumloadcalculationsinawatershedwithanimpoundmentreservoiratanexceptionallylowwaterlevel AT smolickaagnieszka discreteandtimeintegratedsamplingforchromiumloadcalculationsinawatershedwithanimpoundmentreservoiratanexceptionallylowwaterlevel AT dominikjanusz discreteandtimeintegratedsamplingforchromiumloadcalculationsinawatershedwithanimpoundmentreservoiratanexceptionallylowwaterlevel |