Cargando…
The Use of the Direct Optimized Probabilistic Calculation Method in Design of Bolt Reinforcement for Underground and Mining Workings
The load-carrying system of each construction should fulfill several conditions which represent reliable criteria in the assessment procedure. It is the theory of structural reliability which determines probability of keeping required properties of constructions. Using this theory, it is possible to...
Autores principales: | Krejsa, Martin, Janas, Petr, Yilmaz, Işık, Marschalko, Marian, Bouchal, Tomas |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi Publishing Corporation
2013
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3713651/ https://www.ncbi.nlm.nih.gov/pubmed/23935412 http://dx.doi.org/10.1155/2013/267593 |
Ejemplares similares
-
Influence of the Soil Genesis on Physical and Mechanical Properties
por: Marschalko, Marian, et al.
Publicado: (2013) -
Prototype of Instrumented Rock Bolt for Continuous Monitoring of Roof Fall Hazard in Deep Underground Mines
por: Fuławka, Krzysztof, et al.
Publicado: (2022) -
Feasibility Analysis of Bolted Joints with Composite Fibre-Reinforced Thermoplastics
por: Tobalina-Baldeon, Daniel, et al.
Publicado: (2021) -
Underground: Soudan mine experiment
Publicado: (1982) -
Fiber Bragg Grating Monitoring of Full-bolt Axial Force of the Bolt in the Deep Strong Mining Roadway
por: Wang, Peng, et al.
Publicado: (2020)