Cargando…

Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan

In recent years, inventory management is continuous challenge for all organizations not only due to heavy cost associated with inventory holding, but also it has a great deal to do with the organizations production process. Cement industry is a growing sector of Pakistan’s economy which is now facin...

Descripción completa

Detalles Bibliográficos
Autores principales: Qureshi, Muhammad Imran, Iftikhar, Mehwish, Bhatti, Mansoor Nazir, Shams, Tauqeer, Zaman, Khalid
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Springer International Publishing 2013
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3858593/
https://www.ncbi.nlm.nih.gov/pubmed/24340248
http://dx.doi.org/10.1186/2193-1801-2-645
_version_ 1782295296339869696
author Qureshi, Muhammad Imran
Iftikhar, Mehwish
Bhatti, Mansoor Nazir
Shams, Tauqeer
Zaman, Khalid
author_facet Qureshi, Muhammad Imran
Iftikhar, Mehwish
Bhatti, Mansoor Nazir
Shams, Tauqeer
Zaman, Khalid
author_sort Qureshi, Muhammad Imran
collection PubMed
description In recent years, inventory management is continuous challenge for all organizations not only due to heavy cost associated with inventory holding, but also it has a great deal to do with the organizations production process. Cement industry is a growing sector of Pakistan’s economy which is now facing problems in capacity utilization of their plants. This study attempts to identify the key strategies for successful implementation of just-in-time (JIT) management philosophy on the cement industry of Pakistan. The study uses survey responses from four hundred operations’ managers of cement industry in order to know about the advantages and benefits that cement industry have experienced by Just in time (JIT) adoption. The results show that implementing the quality, product design, inventory management, supply chain and production plans embodied through the JIT philosophy which infect enhances cement industry competitiveness in Pakistan. JIT implementation increases performance by lower level of inventory, reduced operations & inventory costs was reduced eliminates wastage from the processes and reduced unnecessary production which is a big challenge for the manufacturer who are trying to maintain the continuous flow processes. JIT implementation is a vital manufacturing strategy that reaches capacity utilization and minimizes the rate of defect in continuous flow processes. The study emphasize the need for top management commitment in order to incorporate the necessary changes that need to take place in cement industry so that JIT implementation can take place in an effective manner.
format Online
Article
Text
id pubmed-3858593
institution National Center for Biotechnology Information
language English
publishDate 2013
publisher Springer International Publishing
record_format MEDLINE/PubMed
spelling pubmed-38585932013-12-11 Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan Qureshi, Muhammad Imran Iftikhar, Mehwish Bhatti, Mansoor Nazir Shams, Tauqeer Zaman, Khalid Springerplus Research In recent years, inventory management is continuous challenge for all organizations not only due to heavy cost associated with inventory holding, but also it has a great deal to do with the organizations production process. Cement industry is a growing sector of Pakistan’s economy which is now facing problems in capacity utilization of their plants. This study attempts to identify the key strategies for successful implementation of just-in-time (JIT) management philosophy on the cement industry of Pakistan. The study uses survey responses from four hundred operations’ managers of cement industry in order to know about the advantages and benefits that cement industry have experienced by Just in time (JIT) adoption. The results show that implementing the quality, product design, inventory management, supply chain and production plans embodied through the JIT philosophy which infect enhances cement industry competitiveness in Pakistan. JIT implementation increases performance by lower level of inventory, reduced operations & inventory costs was reduced eliminates wastage from the processes and reduced unnecessary production which is a big challenge for the manufacturer who are trying to maintain the continuous flow processes. JIT implementation is a vital manufacturing strategy that reaches capacity utilization and minimizes the rate of defect in continuous flow processes. The study emphasize the need for top management commitment in order to incorporate the necessary changes that need to take place in cement industry so that JIT implementation can take place in an effective manner. Springer International Publishing 2013-12-01 /pmc/articles/PMC3858593/ /pubmed/24340248 http://dx.doi.org/10.1186/2193-1801-2-645 Text en © Qureshi et al.; licensee Springer. 2013 This article is published under license to BioMed Central Ltd. This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/2.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
spellingShingle Research
Qureshi, Muhammad Imran
Iftikhar, Mehwish
Bhatti, Mansoor Nazir
Shams, Tauqeer
Zaman, Khalid
Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
title Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
title_full Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
title_fullStr Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
title_full_unstemmed Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
title_short Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
title_sort critical elements in implementations of just-in-time management: empirical study of cement industry in pakistan
topic Research
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3858593/
https://www.ncbi.nlm.nih.gov/pubmed/24340248
http://dx.doi.org/10.1186/2193-1801-2-645
work_keys_str_mv AT qureshimuhammadimran criticalelementsinimplementationsofjustintimemanagementempiricalstudyofcementindustryinpakistan
AT iftikharmehwish criticalelementsinimplementationsofjustintimemanagementempiricalstudyofcementindustryinpakistan
AT bhattimansoornazir criticalelementsinimplementationsofjustintimemanagementempiricalstudyofcementindustryinpakistan
AT shamstauqeer criticalelementsinimplementationsofjustintimemanagementempiricalstudyofcementindustryinpakistan
AT zamankhalid criticalelementsinimplementationsofjustintimemanagementempiricalstudyofcementindustryinpakistan