Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighte...
Autores principales: | Xu, Jiuping, Feng, Cuiying |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi Publishing Corporation
2014
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3914335/ https://www.ncbi.nlm.nih.gov/pubmed/24550708 http://dx.doi.org/10.1155/2014/463692 |
Ejemplares similares
-
Scheduling of resource-constrained projects
por: Klein, Robert
Publicado: (2000) -
Instance dataset for resource-constrained project scheduling with diverging material flows
por: Gehring, Marco, et al.
Publicado: (2023) -
Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
por: Peng, Jun Long, et al.
Publicado: (2023) -
Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks
por: Abello, Manuel Blanco, et al.
Publicado: (2014) -
Mechanism for large-scale canyon deformations due to filling of large reservoir of hydropower project
por: Jiang, Hui, et al.
Publicado: (2020)