Cargando…

Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review an...

Descripción completa

Detalles Bibliográficos
Autores principales: Leong, Tiong Kung, Zakuan, Norhayati, Mat Saman, Muhamad Zameri, Ariff, Mohd. Shoki Md., Tan, Choy Soon
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi Publishing Corporation 2014
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3950655/
https://www.ncbi.nlm.nih.gov/pubmed/24701182
http://dx.doi.org/10.1155/2014/591361
Descripción
Sumario:This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.