Cargando…
Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode
Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMG...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi Publishing Corporation
2014
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4235739/ https://www.ncbi.nlm.nih.gov/pubmed/25538768 http://dx.doi.org/10.1155/2014/682486 |
_version_ | 1782345071860908032 |
---|---|
author | Wang, Li Zhu, Xiaoning |
author_facet | Wang, Li Zhu, Xiaoning |
author_sort | Wang, Li |
collection | PubMed |
description | Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC. |
format | Online Article Text |
id | pubmed-4235739 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2014 |
publisher | Hindawi Publishing Corporation |
record_format | MEDLINE/PubMed |
spelling | pubmed-42357392014-12-23 Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode Wang, Li Zhu, Xiaoning Comput Intell Neurosci Research Article Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC. Hindawi Publishing Corporation 2014 2014-11-04 /pmc/articles/PMC4235739/ /pubmed/25538768 http://dx.doi.org/10.1155/2014/682486 Text en Copyright © 2014 L. Wang and X. Zhu. https://creativecommons.org/licenses/by/3.0/ This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. |
spellingShingle | Research Article Wang, Li Zhu, Xiaoning Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode |
title | Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode |
title_full | Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode |
title_fullStr | Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode |
title_full_unstemmed | Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode |
title_short | Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode |
title_sort | rail mounted gantry crane scheduling optimization in railway container terminal based on hybrid handling mode |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4235739/ https://www.ncbi.nlm.nih.gov/pubmed/25538768 http://dx.doi.org/10.1155/2014/682486 |
work_keys_str_mv | AT wangli railmountedgantrycraneschedulingoptimizationinrailwaycontainerterminalbasedonhybridhandlingmode AT zhuxiaoning railmountedgantrycraneschedulingoptimizationinrailwaycontainerterminalbasedonhybridhandlingmode |