Cargando…

Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit

CONTEXT: Quality assurance of providing a work ready machine in multiple theatre operating rooms in a tertiary modern medical center in Riyadh. AIMS: The aim of the following study is to keep high quality environment for workers and patients in surgical operating rooms. SETTINGS AND DESIGN: Technici...

Descripción completa

Detalles Bibliográficos
Autores principales: Al Suhaibani, Mazen, Al Malki, Assaf, Al Dosary, Saad, Al Barmawi, Hanan, Pogoku, Mahdhav
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Medknow Publications & Media Pvt Ltd 2014
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4258968/
https://www.ncbi.nlm.nih.gov/pubmed/25886335
http://dx.doi.org/10.4103/0259-1162.143142
_version_ 1782347943798374400
author Al Suhaibani, Mazen
Al Malki, Assaf
Al Dosary, Saad
Al Barmawi, Hanan
Pogoku, Mahdhav
author_facet Al Suhaibani, Mazen
Al Malki, Assaf
Al Dosary, Saad
Al Barmawi, Hanan
Pogoku, Mahdhav
author_sort Al Suhaibani, Mazen
collection PubMed
description CONTEXT: Quality assurance of providing a work ready machine in multiple theatre operating rooms in a tertiary modern medical center in Riyadh. AIMS: The aim of the following study is to keep high quality environment for workers and patients in surgical operating rooms. SETTINGS AND DESIGN: Technicians based audit by using key performance indicators to assure inspection, passing test of machine worthiness for use daily and in between cases and in case of unexpected failure to provide quick replacement by ready to use another anesthetic machine. MATERIALS AND METHODS: The anesthetic machines in all operating rooms are daily and continuously inspected and passed as ready by technicians and verified by anesthesiologist consultant or assistant consultant. The daily records of each machines were collected then inspected for data analysis by quality improvement committee department for descriptive analysis and report the degree of staff compliance to daily inspection as “met” items. Replaced machine during use and overall compliance. STATISTICAL ANALYSIS USED: Distractive statistic using Microsoft Excel 2003 tables and graphs of sums and percentages of item studied in this audit. RESULTS: Audit obtained highest compliance percentage and low rate of replacement of machine which indicate unexpected machine state of use and quick machine switch. CONCLUSIONS: The authors are able to conclude that following regular inspection and running self-check recommended by the manufacturers can contribute to abort any possibility of hazard of anesthesia machine failure during operation. Furthermore in case of unexpected reason to replace the anesthesia machine in quick maneuver contributes to high assured operative utilization of man machine inter-phase in modern surgical operating rooms.
format Online
Article
Text
id pubmed-4258968
institution National Center for Biotechnology Information
language English
publishDate 2014
publisher Medknow Publications & Media Pvt Ltd
record_format MEDLINE/PubMed
spelling pubmed-42589682014-12-08 Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit Al Suhaibani, Mazen Al Malki, Assaf Al Dosary, Saad Al Barmawi, Hanan Pogoku, Mahdhav Anesth Essays Res Original Article CONTEXT: Quality assurance of providing a work ready machine in multiple theatre operating rooms in a tertiary modern medical center in Riyadh. AIMS: The aim of the following study is to keep high quality environment for workers and patients in surgical operating rooms. SETTINGS AND DESIGN: Technicians based audit by using key performance indicators to assure inspection, passing test of machine worthiness for use daily and in between cases and in case of unexpected failure to provide quick replacement by ready to use another anesthetic machine. MATERIALS AND METHODS: The anesthetic machines in all operating rooms are daily and continuously inspected and passed as ready by technicians and verified by anesthesiologist consultant or assistant consultant. The daily records of each machines were collected then inspected for data analysis by quality improvement committee department for descriptive analysis and report the degree of staff compliance to daily inspection as “met” items. Replaced machine during use and overall compliance. STATISTICAL ANALYSIS USED: Distractive statistic using Microsoft Excel 2003 tables and graphs of sums and percentages of item studied in this audit. RESULTS: Audit obtained highest compliance percentage and low rate of replacement of machine which indicate unexpected machine state of use and quick machine switch. CONCLUSIONS: The authors are able to conclude that following regular inspection and running self-check recommended by the manufacturers can contribute to abort any possibility of hazard of anesthesia machine failure during operation. Furthermore in case of unexpected reason to replace the anesthesia machine in quick maneuver contributes to high assured operative utilization of man machine inter-phase in modern surgical operating rooms. Medknow Publications & Media Pvt Ltd 2014 /pmc/articles/PMC4258968/ /pubmed/25886335 http://dx.doi.org/10.4103/0259-1162.143142 Text en Copyright: © Anesthesia: Essays and Researches http://creativecommons.org/licenses/by-nc-sa/3.0 This is an open-access article distributed under the terms of the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
spellingShingle Original Article
Al Suhaibani, Mazen
Al Malki, Assaf
Al Dosary, Saad
Al Barmawi, Hanan
Pogoku, Mahdhav
Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
title Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
title_full Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
title_fullStr Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
title_full_unstemmed Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
title_short Pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
title_sort pre-use anesthesia machine check; certified anesthesia technician based quality improvement audit
topic Original Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4258968/
https://www.ncbi.nlm.nih.gov/pubmed/25886335
http://dx.doi.org/10.4103/0259-1162.143142
work_keys_str_mv AT alsuhaibanimazen preuseanesthesiamachinecheckcertifiedanesthesiatechnicianbasedqualityimprovementaudit
AT almalkiassaf preuseanesthesiamachinecheckcertifiedanesthesiatechnicianbasedqualityimprovementaudit
AT aldosarysaad preuseanesthesiamachinecheckcertifiedanesthesiatechnicianbasedqualityimprovementaudit
AT albarmawihanan preuseanesthesiamachinecheckcertifiedanesthesiatechnicianbasedqualityimprovementaudit
AT pogokumahdhav preuseanesthesiamachinecheckcertifiedanesthesiatechnicianbasedqualityimprovementaudit